Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Nebraska–Lincoln |
---|---|
Assessment Year | 2017 |
Principal Product | Refrigeration and Heating Equipment |
NAICS | 333415 - Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen |
SIC | 3585 - Refrigeration And Heating Equipment |
Sales | $100,000,000-$500,000,000 |
# of Employees | 430 |
Plant Area (Sq.Ft.) | 234,000 |
Annual Production | 42,000 Units |
Production Hrs. Annual | 4,500 |
Location (State) | NE |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $244,817 | 4,382,000 | kWh | $0.06 |
Electricity Demand | $96,474 | 11,963 | kW-months/year | $8.06 |
Natural Gas | $63,563 | 15,196 | MMBtu | $4.18 |
TOTAL ENERGY COSTS | $424,210 | |||
RECOMMENDED SAVINGS* | $50,178 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $45,100 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $32,693 Cost: $189,100 |
$24,279 | 433,550 | $8,415 | 1,044 | - | - | - | - | - | - | - | - |
$24,279 433,550 kWh |
$8,415 1,044 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS |
Savings: $5,416 Cost: - |
- | - | $5,416 | 672 | - | - | - | - | - | - | - | - |
- - kWh |
$5,416 672 kW-months/year |
- - MMBtu |
- - Tgal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $5,079 Cost: $12,500 |
- | - | - | - | $5,079 | 1,215 | - | - | - | - | - | - |
- - kWh |
- - kW-months/year |
$5,079 1,215 MMBtu |
- - Tgal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) |
Savings: $3,800 Cost: - |
- | - | - | - | - | - | $3,800 | 1,240 | - | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$3,800 1,240 Tgal |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $3,190 Cost: $4,500 |
$3,640 | 65,000 | - | - | - | - | - | - | $(-350) | - | $(-100) | - |
$3,640 65,000 kWh |
- - kW-months/year |
- - MMBtu |
- - Tgal |
$(-350) - $ |
$(-100) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $50,178 Cost: $206,100 |
$27,919 | 498,550 | $13,831 | 1,716 | $5,079 | 1,215 | $3,800 | 1,240 | $(-350) | - | $(-100) | - | $27,919 498,550 kWh |
$13,831 1,716 kW-months/year |
$5,079 1,215 MMBtu |
$3,800 1,240 Tgal |
$(-350) - $ |
$(-100) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $45,100 Cost: $193,600 |
$27,919 | 498,550 | $13,831 | 1,716 | - | - | $3,800 | 1,240 | $(-350) | - | $(-100) | - | $27,919 498,550 kWh |
$13,831 1,716 kW-months/year |
- - MMBtu |
$3,800 1,240 Tgal |
$(-350) - $ |
$(-100) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | Tgal | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Natural Gas | Water Disposal | Personnel Changes | Ancillary Material Cost |