IAC logo
IAC Assessment: NL0018
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NL0018
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nebraska–Lincoln
Assessment Year 2018
Principal Product Treated Wastewater
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $5,000,000-$10,000,000
# of Employees 9
Plant Area (Sq.Ft.) 1,176,000
Annual Production 1,457,950 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $188,787 3,371,200 kWh $0.06
Electricity Demand $3,540 467 kW-months/year $7.58
Electricity Fees $83,723 - $ -
Natural Gas $58,883 11,341 MMBtu $5.19
TOTAL ENERGY COSTS $334,933
RECOMMENDED SAVINGS* $38,840 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,540
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
01: 2.4131 SIZE ELECTRIC MOTORS FOR PEAK OPERATING EFFICIENCY Savings:
$24,300
Cost:
$149,000
$20,500 366,000 $3,800 502 - - - - - - $20,500
366,000
kWh
$3,800
502
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
02: 2.2211 USE OPTIMUM TEMPERATURE Savings:
$9,300
Cost:
$210
$1,800 32,142 $(-320) (-42) $7,820 1,506 - - - - $1,800
32,142
kWh
$(-320)
(-42)
kW-months/year
$7,820
1,506
MMBtu
-
-
$
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$3,700
Cost:
$2,500
$2,958 52,800 - - - - $380 - $362 - $2,958
52,800
kWh
-
-
kW-months/year
-
-
MMBtu
$380
-
$
$362
-
$
04: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,100
Cost:
$820
$1,100 19,643 - - - - - - - - $1,100
19,643
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$440
Cost:
$210
$116 2,071 - - - - $324 - - - $116
2,071
kWh
-
-
kW-months/year
-
-
MMBtu
$324
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$38,840
Cost:
$152,740
$26,474 472,656 $3,480 459 $7,820 1,506 $704 - $362 - $26,474
472,656
kWh
$3,480
459
kW-months/year
$7,820
1,506
MMBtu
$704
-
$
$362
-
$
TOTAL IMPLEMENTED Savings:
$14,540
Cost:
$3,740
$5,974 106,656 $(-320) (-42) $7,820 1,506 $704 - $362 - $5,974
106,656
kWh
$(-320)
(-42)
kW-months/year
$7,820
1,506
MMBtu
$704
-
$
$362
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Natural Gas Personnel Changes One-time Revenue or Avoided Cost