IAC logo
IAC Assessment: NL0021
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NL0021
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nebraska–Lincoln
Assessment Year 2018
Principal Product Animal Feed
NAICS 311119 - Other Animal Food Manufacturing
SIC 2048 - Prepared Feeds, Nec
Sales $1,000,000-$5,000,000
# of Employees 30
Plant Area (Sq.Ft.) 60,750
Annual Production 85,000 Tons
Production Hrs. Annual 6,000
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $55,648 2,131,800 kWh $0.03
Electricity Demand $214,236 10,573 kW-months/year $20.26
Electricity Fees $4,635 - $ -
Natural Gas $81,082 21,982 MMBtu $3.69
TOTAL ENERGY COSTS $355,601
RECOMMENDED SAVINGS* $14,464 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $14,464
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Personnel Changes Electricity Usage Electricity Demand Electricity Fees Personnel Changes
$ kWh $ kW-months/year $ $ $ $
01: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$12,355
Cost:
-
$(-4,469) (0) $18,228 1,223 $(-396) - $(-1,008) - $(-4,469)
(0)
kWh
$18,228
1,223
kW-months/year
$(-396)
-
$
$(-1,008)
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,774
Cost:
$15,206
$790 29,925 $984 50 - - - - $790
29,925
kWh
$984
50
kW-months/year
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$335
Cost:
$1,000
$461 17,746 - - - - $(-126) - $461
17,746
kWh
-
-
kW-months/year
-
-
$
$(-126)
-
$
TOTAL RECOMMENDED Savings:
$14,464
Cost:
$16,206
$(-3,218) 47,671 $19,212 1,274 $(-396) - $(-1,134) - $(-3,218)
47,671
kWh
$19,212
1,274
kW-months/year
$(-396)
-
$
$(-1,134)
-
$
TOTAL IMPLEMENTED Savings:
$14,464
Cost:
$16,206
$(-3,218) 47,671 $19,212 1,274 $(-396) - $(-1,134) - $(-3,218)
47,671
kWh
$19,212
1,274
kW-months/year
$(-396)
-
$
$(-1,134)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Personnel Changes Electricity Usage Electricity Demand Electricity Fees Personnel Changes