IAC Assessment: NL0041
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NL0041
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nebraska–Lincoln
Assessment Year 2019
Principal Product Rubber Stoppers
NAICS 325412 - Pharmaceutical Preparation Manufacturing
SIC 2834 - Pharmaceutical Preparations
Sales $50,000,000-$100,000,000
# of Employees 250
Plant Area (Sq.Ft.) 100,000
Annual Production 8,000,000,000 Units
Production Hrs. Annual 6,240
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $368,666 9,393,184 kWh $0.04
Electricity Demand $397,488 18,928 kW-months/year $21.00
Natural Gas $163,199 45,046 MMBtu $3.62
TOTAL ENERGY COSTS $960,610
RECOMMENDED SAVINGS* $271,828 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $269,210
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $ $ $
01: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$238,833
Cost:
$700,000
$109,041 2,726,016 $124,992 5,952 - - - - $4,800 - - - - - $109,041
2,726,016
kWh
$124,992
5,952
kW-months/year
-
-
$
-
-
MMBtu
$4,800
-
$
-
-
$
-
-
$
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$10,636
Cost:
$52,000
- - - - $10,636 - - - - - - - - - -
-
kWh
-
-
kW-months/year
$10,636
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,751
Cost:
$600
$7,011 173,907 - - - - - - $(-160) - $(-100) - - - $7,011
173,907
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$(-160)
-
$
$(-100)
-
$
-
-
$
04: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$5,670
Cost:
$100
- - $5,670 270 - - - - - - - - - - -
-
kWh
$5,670
270
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
05: 2.7444 CLOSE HOLES AND OPENINGS IN BUILDING SUCH AS BROKEN WINDOWS Savings:
$5,000
Cost:
$19,750
- - - - - - - - - - - - $5,000 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
$5,000
-
$
06: 3.5314 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE Savings:
$2,618
Cost:
$3,180
- - - - - - - - $148 - $2,470 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$148
-
$
$2,470
-
$
-
-
$
07: 2.2135 REPAIR AND ELIMINATE STEAM LEAKS Savings:
$2,123
Cost:
$200
- - - - - - $5,003 1,381 $(-2,880) - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$5,003
1,381
MMBtu
$(-2,880)
-
$
-
-
$
-
-
$
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$197
Cost:
$674
$115 2,871 $83 4 - - - - - - - - - - $115
2,871
kWh
$83
4
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$271,828
Cost:
$776,504
$116,167 2,902,794 $130,745 6,226 $10,636 - $5,003 1,381 $1,908 - $2,370 - $5,000 - $116,167
2,902,794
kWh
$130,745
6,226
kW-months/year
$10,636
-
$
$5,003
1,381
MMBtu
$1,908
-
$
$2,370
-
$
$5,000
-
$
TOTAL IMPLEMENTED Savings:
$269,210
Cost:
$773,324
$116,167 2,902,794 $130,745 6,226 $10,636 - $5,003 1,381 $1,760 - $(-100) - $5,000 - $116,167
2,902,794
kWh
$130,745
6,226
kW-months/year
$10,636
-
$
$5,003
1,381
MMBtu
$1,760
-
$
$(-100)
-
$
$5,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost