IAC logo
IAC Assessment: NL0043
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NL0043
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nebraska–Lincoln
Assessment Year 2020
Principal Product Treated Wastewater
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $500,000-$1,000,000
# of Employees 3
Plant Area (Sq.Ft.) 23,590
Annual Production 256,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $146,707 2,095,810 kWh $0.07
Natural Gas $8,699 1,376 MMBtu $6.32
TOTAL ENERGY COSTS $155,406
RECOMMENDED SAVINGS* $56,580 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,280
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$22,480
Cost:
$37,056
$22,480 342,365 - - - - - - $22,480
342,365
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
02: 2.6125 KEEP EQUIPMENT CLEAN Savings:
$10,419
Cost:
$41,591
- - - - - - $10,419 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$10,419
-
$
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$15,824
Cost:
$25,408
$15,824 226,058 - - - - - - $15,824
226,058
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
04: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$3,551
Cost:
$70
$2,790 49,824 $761 69 - - - - $2,790
49,824
kWh
$761
69
kW-months/year
-
-
MMBtu
-
-
$
05: 2.7231 USE RADIANT HEATER FOR SPOT HEATING Savings:
$1,657
Cost:
$2,700
$9,445 134,929 - - $(-7,788) (-885) - - $9,445
134,929
kWh
-
-
kW-months/year
$(-7,788)
(-885)
MMBtu
-
-
$
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,010
Cost:
$1,108
$564 8,060 - - - - $446 - $564
8,060
kWh
-
-
kW-months/year
-
-
MMBtu
$446
-
$
07: 2.3131 RESCHEDULE PLANT OPERATIONS OR REDUCE LOAD TO AVOID PEAKS Savings:
$920
Cost:
$70
- - $920 87 - - - - -
-
kWh
$920
87
kW-months/year
-
-
MMBtu
-
-
$
08: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$719
Cost:
$135
- - - - $719 78 - - -
-
kWh
-
-
kW-months/year
$719
78
MMBtu
-
-
$
TOTAL RECOMMENDED Savings:
$56,580
Cost:
$108,138
$51,103 761,236 $1,681 156 $(-7,069) (-807) $10,865 - $51,103
761,236
kWh
$1,681
156
kW-months/year
$(-7,069)
(-807)
MMBtu
$10,865
-
$
TOTAL IMPLEMENTED Savings:
$5,280
Cost:
$1,313
$3,354 57,884 $761 69 $719 78 $446 - $3,354
57,884
kWh
$761
69
kW-months/year
$719
78
MMBtu
$446
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Natural Gas Personnel Changes Electricity Usage Electricity Demand Natural Gas Personnel Changes