Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Nebraska–Lincoln |
---|---|
Assessment Year | 2021 |
Principal Product | Capacitors |
NAICS | 334416 - Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing |
SIC | 3675 - Electronic Capacitors |
Sales | $10,000,000-$50,000,000 |
# of Employees | 85 |
Plant Area (Sq.Ft.) | 128,500 |
Annual Production | 11,000,000 Units |
Production Hrs. Annual | 2,400 |
Location (State) | NE |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $38,955 | 1,045,316 | kWh | $0.04 |
Electricity Demand | $122,654 | 5,589 | kW-months/year | $21.95 |
Electricity Fees | $34,321 | - | $ | - |
Natural Gas | $27,191 | 4,529 | MMBtu | $6.00 |
TOTAL ENERGY COSTS | $230,065 | |||
RECOMMENDED SAVINGS* | $39,383 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $30,026 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $29,547 Cost: $51,468 |
$4,942 | 133,806 | $20,520 | 935 | $4,086 | - | - | - |
$4,942 133,806 kWh |
$20,520 935 kW-months/year |
$4,086 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.7228 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM |
Savings: $8,198 Cost: $50,347 |
$7,255 | 196,090 | $503 | 23 | $440 | - | - | - |
$7,255 196,090 kWh |
$503 23 kW-months/year |
$440 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $702 Cost: $4,153 |
$702 | 18,989 | - | - | - | - | - | - |
$702 18,989 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $479 Cost: $500 |
$1,459 | 39,411 | - | - | $(-880) | - | $(-100) | - |
$1,459 39,411 kWh |
- - kW-months/year |
$(-880) - $ |
$(-100) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $318 Cost: $1,350 |
$318 | 8,593 | - | - | - | - | - | - |
$318 8,593 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED |
Savings: $139 Cost: $220 |
$139 | 3,759 | - | - | - | - | - | - |
$139 3,759 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $39,383 Cost: $108,038 |
$14,815 | 400,648 | $21,022 | 958 | $3,646 | - | $(-100) | - | $14,815 400,648 kWh |
$21,022 958 kW-months/year |
$3,646 - $ |
$(-100) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $30,026 Cost: $51,968 |
$6,401 | 173,217 | $20,520 | 935 | $3,206 | - | $(-100) | - | $6,401 173,217 kWh |
$20,520 935 kW-months/year |
$3,206 - $ |
$(-100) - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Personnel Changes | Ancillary Material Cost |