IAC logo
IAC Assessment: NL0059
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NL0059
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nebraska–Lincoln
Assessment Year 2021
Principal Product Capacitors
NAICS 334416 - Capacitor, Resistor, Coil, Transformer, and Other Inductor Manufacturing
SIC 3675 - Electronic Capacitors
Sales $10,000,000-$50,000,000
# of Employees 85
Plant Area (Sq.Ft.) 128,500
Annual Production 11,000,000 Units
Production Hrs. Annual 2,400
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $38,955 1,045,316 kWh $0.04
Electricity Demand $122,654 5,589 kW-months/year $21.95
Electricity Fees $34,321 - $ -
Natural Gas $27,191 4,529 MMBtu $6.00
TOTAL ENERGY COSTS $230,065
RECOMMENDED SAVINGS* $39,383 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $30,026
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$29,547
Cost:
$51,468
$4,942 133,806 $20,520 935 $4,086 - - - $4,942
133,806
kWh
$20,520
935
kW-months/year
$4,086
-
$
-
-
$
02: 2.7228 AVOID INTRODUCING HOT, HUMID, OR DIRTY AIR INTO HVAC SYSTEM Savings:
$8,198
Cost:
$50,347
$7,255 196,090 $503 23 $440 - - - $7,255
196,090
kWh
$503
23
kW-months/year
$440
-
$
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$702
Cost:
$4,153
$702 18,989 - - - - - - $702
18,989
kWh
-
-
kW-months/year
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$479
Cost:
$500
$1,459 39,411 - - $(-880) - $(-100) - $1,459
39,411
kWh
-
-
kW-months/year
$(-880)
-
$
$(-100)
-
$
05: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$318
Cost:
$1,350
$318 8,593 - - - - - - $318
8,593
kWh
-
-
kW-months/year
-
-
$
-
-
$
06: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$139
Cost:
$220
$139 3,759 - - - - - - $139
3,759
kWh
-
-
kW-months/year
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$39,383
Cost:
$108,038
$14,815 400,648 $21,022 958 $3,646 - $(-100) - $14,815
400,648
kWh
$21,022
958
kW-months/year
$3,646
-
$
$(-100)
-
$
TOTAL IMPLEMENTED Savings:
$30,026
Cost:
$51,968
$6,401 173,217 $20,520 935 $3,206 - $(-100) - $6,401
173,217
kWh
$20,520
935
kW-months/year
$3,206
-
$
$(-100)
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost