IAC logo
IAC Assessment: NL0061
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NL0061
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nebraska–Lincoln
Assessment Year 2022
Principal Product OTC Medicine
NAICS 325412 - Pharmaceutical Preparation Manufacturing
SIC 2834 - Pharmaceutical Preparations
Sales $50,000,000-$100,000,000
# of Employees 500
Plant Area (Sq.Ft.) 628,000
Annual Production 500,000,000 Units
Production Hrs. Annual 6,400
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $497,741 20,346,033 kWh $0.02
Electricity Demand $742,529 36,603 kW-months/year $20.29
Electricity Fees $88,647 - $ -
Natural Gas $377,385 87,798 MMBtu $4.30
TOTAL ENERGY COSTS $1,755,128
RECOMMENDED SAVINGS* $34,197 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $19,602
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Water Disposal Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ Tgal $ $ $ $
01: 3.4155 METER WASTE WATER Savings:
$9,914
Cost:
$580
- - - - $9,914 4,420 - - - - -
-
kWh
-
-
kW-months/year
$9,914
4,420
Tgal
-
-
$
-
-
$
02: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$9,080
Cost:
$70
- - $9,080 448 - - - - - - -
-
kWh
$9,080
448
kW-months/year
-
-
Tgal
-
-
$
-
-
$
03: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY Savings:
$4,939
Cost:
$70
$2,314 94,448 $2,625 129 - - - - - - $2,314
94,448
kWh
$2,625
129
kW-months/year
-
-
Tgal
-
-
$
-
-
$
04: 3.4155 METER WASTE WATER Savings:
$3,714
Cost:
$580
- - - - $3,714 1,656 - - - - -
-
kWh
-
-
kW-months/year
$3,714
1,656
Tgal
-
-
$
-
-
$
05: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$3,432
Cost:
$3,500
- - - - - - $840 - $2,592 - -
-
kWh
-
-
kW-months/year
-
-
Tgal
$840
-
$
$2,592
-
$
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,556
Cost:
$2,500
$2,216 90,462 - - - - $(-560) - $(-100) - $2,216
90,462
kWh
-
-
kW-months/year
-
-
Tgal
$(-560)
-
$
$(-100)
-
$
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$967
Cost:
$1,650
$383 15,624 $584 29 - - - - - - $383
15,624
kWh
$584
29
kW-months/year
-
-
Tgal
-
-
$
-
-
$
08: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$595
Cost:
$1,289
$595 24,284 - - - - - - - - $595
24,284
kWh
-
-
kW-months/year
-
-
Tgal
-
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$34,197
Cost:
$10,239
$5,508 224,818 $12,289 606 $13,628 6,076 $280 - $2,492 - $5,508
224,818
kWh
$12,289
606
kW-months/year
$13,628
6,076
Tgal
$280
-
$
$2,492
-
$
TOTAL IMPLEMENTED Savings:
$19,602
Cost:
$7,429
$5,125 209,194 $11,705 577 - - $280 - $2,492 - $5,125
209,194
kWh
$11,705
577
kW-months/year
-
-
Tgal
$280
-
$
$2,492
-
$
Savings
Cost
$ kWh $ kW-months/year $ Tgal $ $ $ $
Electricity Usage Electricity Demand Water Disposal Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Water Disposal Personnel Changes Ancillary Material Cost