Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Nebraska–Lincoln |
---|---|
Assessment Year | 2022 |
Principal Product | OTC Medicine |
NAICS | 325412 - Pharmaceutical Preparation Manufacturing |
SIC | 2834 - Pharmaceutical Preparations |
Sales | $50,000,000-$100,000,000 |
# of Employees | 500 |
Plant Area (Sq.Ft.) | 628,000 |
Annual Production | 500,000,000 Units |
Production Hrs. Annual | 6,400 |
Location (State) | NE |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $497,741 | 20,346,033 | kWh | $0.02 |
Electricity Demand | $742,529 | 36,603 | kW-months/year | $20.29 |
Electricity Fees | $88,647 | - | $ | - |
Natural Gas | $377,385 | 87,798 | MMBtu | $4.30 |
TOTAL ENERGY COSTS | $1,755,128 | |||
RECOMMENDED SAVINGS* | $34,197 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $19,602 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Water Disposal | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Water Disposal | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | Tgal | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.4155 METER WASTE WATER |
Savings: $9,914 Cost: $580 |
- | - | - | - | $9,914 | 4,420 | - | - | - | - |
- - kWh |
- - kW-months/year |
$9,914 4,420 Tgal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.3137 USE POWER DURING OFF-PEAK PERIODS |
Savings: $9,080 Cost: $70 |
- | - | $9,080 | 448 | - | - | - | - | - | - |
- - kWh |
$9,080 448 kW-months/year |
- - Tgal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.6221 USE MOST EFFICIENT EQUIPMENT AT IT'S MAXIMUM CAPACITY AND LESS EFFICIENT EQUIPMENT ONLY WHEN NECESSARY |
Savings: $4,939 Cost: $70 |
$2,314 | 94,448 | $2,625 | 129 | - | - | - | - | - | - |
$2,314 94,448 kWh |
$2,625 129 kW-months/year |
- - Tgal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 3.4155 METER WASTE WATER |
Savings: $3,714 Cost: $580 |
- | - | - | - | $3,714 | 1,656 | - | - | - | - |
- - kWh |
- - kW-months/year |
$3,714 1,656 Tgal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.5311 RECOVER AND REUSE WASTE MATERIAL |
Savings: $3,432 Cost: $3,500 |
- | - | - | - | - | - | $840 | - | $2,592 | - |
- - kWh |
- - kW-months/year |
- - Tgal |
$840 - $ |
$2,592 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,556 Cost: $2,500 |
$2,216 | 90,462 | - | - | - | - | $(-560) | - | $(-100) | - |
$2,216 90,462 kWh |
- - kW-months/year |
- - Tgal |
$(-560) - $ |
$(-100) - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $967 Cost: $1,650 |
$383 | 15,624 | $584 | 29 | - | - | - | - | - | - |
$383 15,624 kWh |
$584 29 kW-months/year |
- - Tgal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.7135 INSTALL OCCUPANCY SENSORS |
Savings: $595 Cost: $1,289 |
$595 | 24,284 | - | - | - | - | - | - | - | - |
$595 24,284 kWh |
- - kW-months/year |
- - Tgal |
- - $ |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $34,197 Cost: $10,239 |
$5,508 | 224,818 | $12,289 | 606 | $13,628 | 6,076 | $280 | - | $2,492 | - | $5,508 224,818 kWh |
$12,289 606 kW-months/year |
$13,628 6,076 Tgal |
$280 - $ |
$2,492 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $19,602 Cost: $7,429 |
$5,125 | 209,194 | $11,705 | 577 | - | - | $280 | - | $2,492 | - | $5,125 209,194 kWh |
$11,705 577 kW-months/year |
- - Tgal |
$280 - $ |
$2,492 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | Tgal | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Water Disposal | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Water Disposal | Personnel Changes | Ancillary Material Cost |