Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Nebraska–Lincoln |
---|---|
Assessment Year | 2022 |
Principal Product | Treated Wastewater |
NAICS | 221320 - Sewage Treatment Facilities |
SIC | 4952 - Sewerage Systems |
Sales | $1,000,000-$5,000,000 |
# of Employees | 15 |
Plant Area (Sq.Ft.) | 250,000 |
Annual Production | 3,358,000 Thousand Gallons |
Production Hrs. Annual | 8,760 |
Location (State) | SD |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $460,329 | 5,481,629 | kWh | $0.08 |
Electricity Demand | $74,910 | 10,394 | kW-months/year | $7.21 |
Electricity Fees | $1,320 | - | $ | - |
Natural Gas | $37,429 | 6,727 | MMBtu | $5.56 |
TOTAL ENERGY COSTS | $573,987 | |||
RECOMMENDED SAVINGS* | $63,843 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $15,915 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.3413 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT |
Savings: $45,354 Cost: $242,300 |
$13,632 | 162,280 | $5,946 | 825 | $25,776 | 4,633 | - | - | - | - |
$13,632 162,280 kWh |
$5,946 825 kW-months/year |
$25,776 4,633 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $9,581 Cost: $24,336 |
- | - | - | - | - | - | - | - | $9,581 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$9,581 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $4,498 Cost: $18,517 |
$3,762 | 44,781 | $736 | 102 | - | - | - | - | - | - |
$3,762 44,781 kWh |
$736 102 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $1,413 Cost: $660 |
$1,413 | 16,842 | - | - | - | - | - | - | - | - |
$1,413 16,842 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.5311 RECOVER AND REUSE WASTE MATERIAL |
Savings: $1,313 Cost: $440 |
- | - | - | - | - | - | $1,313 | 484,880 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$1,313 484,880 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $1,261 Cost: $918 |
$1,261 | 15,007 | - | - | - | - | - | - | - | - |
$1,261 15,007 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7229 AIR CONDITION ONLY SPACE NECESSARY |
Savings: $424 Cost: $50,000 |
$424 | 5,040 | - | - | - | - | - | - | - | - |
$424 5,040 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $63,843 Cost: $337,171 |
$20,491 | 243,950 | $6,682 | 927 | $25,776 | 4,633 | $1,313 | 484,880 | $9,581 | - | $20,491 243,950 kWh |
$6,682 927 kW-months/year |
$25,776 4,633 MMBtu |
$1,313 484,880 lb |
$9,581 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $15,915 Cost: $93,513 |
$5,598 | 66,663 | $736 | 102 | - | - | - | - | $9,581 | - | $5,598 66,663 kWh |
$736 102 kW-months/year |
- - MMBtu |
- - lb |
$9,581 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Personnel Changes |