IAC logo
IAC Assessment: NL0062
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NL0062
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nebraska–Lincoln
Assessment Year 2022
Principal Product Treated Wastewater
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $1,000,000-$5,000,000
# of Employees 15
Plant Area (Sq.Ft.) 250,000
Annual Production 3,358,000 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) SD
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $460,329 5,481,629 kWh $0.08
Electricity Demand $74,910 10,394 kW-months/year $7.21
Electricity Fees $1,320 - $ -
Natural Gas $37,429 6,727 MMBtu $5.56
TOTAL ENERGY COSTS $573,987
RECOMMENDED SAVINGS* $63,843 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,915
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.3413 BURN FOSSIL FUEL TO PRODUCE STEAM TO DRIVE A STEAM TURBINE-GENERATOR AND USE STEAM EXHAUST FOR HEAT Savings:
$45,354
Cost:
$242,300
$13,632 162,280 $5,946 825 $25,776 4,633 - - - - $13,632
162,280
kWh
$5,946
825
kW-months/year
$25,776
4,633
MMBtu
-
-
lb
-
-
$
02: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$9,581
Cost:
$24,336
- - - - - - - - $9,581 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$9,581
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,498
Cost:
$18,517
$3,762 44,781 $736 102 - - - - - - $3,762
44,781
kWh
$736
102
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,413
Cost:
$660
$1,413 16,842 - - - - - - - - $1,413
16,842
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
05: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$1,313
Cost:
$440
- - - - - - $1,313 484,880 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,313
484,880
lb
-
-
$
06: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$1,261
Cost:
$918
$1,261 15,007 - - - - - - - - $1,261
15,007
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
07: 2.7229 AIR CONDITION ONLY SPACE NECESSARY Savings:
$424
Cost:
$50,000
$424 5,040 - - - - - - - - $424
5,040
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
TOTAL RECOMMENDED Savings:
$63,843
Cost:
$337,171
$20,491 243,950 $6,682 927 $25,776 4,633 $1,313 484,880 $9,581 - $20,491
243,950
kWh
$6,682
927
kW-months/year
$25,776
4,633
MMBtu
$1,313
484,880
lb
$9,581
-
$
TOTAL IMPLEMENTED Savings:
$15,915
Cost:
$93,513
$5,598 66,663 $736 102 - - - - $9,581 - $5,598
66,663
kWh
$736
102
kW-months/year
-
-
MMBtu
-
-
lb
$9,581
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes