Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Nebraska–Lincoln |
---|---|
Assessment Year | 2023 |
Principal Product | Treated Wastewater |
NAICS | 221320 - Sewage Treatment Facilities |
SIC | 4952 - Sewerage Systems |
Sales | $500,000-$1,000,000 |
# of Employees | 2 |
Plant Area (Sq.Ft.) | 24,488 |
Annual Production | 210,240 Thousand Gallons |
Production Hrs. Annual | 8,760 |
Location (State) | NE |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $63,096 | 1,232,240 | kWh | $0.05 |
Electricity Demand | $36,312 | 2,598 | kW-months/year | $13.98 |
Electricity Fees | $999 | - | $ | - |
Natural Gas | $5,078 | 604 | MMBtu | $8.40 |
TOTAL ENERGY COSTS | $105,485 | |||
RECOMMENDED SAVINGS* | $70,463 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $58,625 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Personnel Changes | Ancillary Material Cost | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 3.4155 METER WASTE WATER |
Savings: $31,255 Cost: $151,280 |
$1,255 | 24,515 | - | - | - | - | $30,000 | - |
$1,255 24,515 kWh |
- - kW-months/year |
- - $ |
$30,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT |
Savings: $18,134 Cost: $8,660 |
$11,376 | 222,189 | $6,758 | 483 | - | - | - | - |
$11,376 222,189 kWh |
$6,758 483 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS |
Savings: $11,038 Cost: $4,600 |
$1,066 | 20,652 | $(-28) | (-2) | - | - | $10,000 | - |
$1,066 20,652 kWh |
$(-28) (-2) kW-months/year |
- - $ |
$10,000 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $8,182 Cost: $4,945 |
$8,182 | 160,151 | - | - | - | - | - | - |
$8,182 160,151 kWh |
- - kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $854 Cost: $2,700 |
$588 | 11,484 | $266 | 19 | - | - | - | - |
$588 11,484 kWh |
$266 19 kW-months/year |
- - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 3.4131 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT |
Savings: $800 Cost: $1,548 |
- | - | - | - | $800 | - | - | - |
- - kWh |
- - kW-months/year |
$800 - $ |
- - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 3.7391 IMPLEMENT A MAINTENANCE PROGRAM TO KEEP RACKS AND TANKS FREE OF RUST, CRACKS, OR CORROSION |
Savings: $200 Cost: $2,040 |
- | - | - | - | $(-480) | - | $680 | - |
- - kWh |
- - kW-months/year |
$(-480) - $ |
$680 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $70,463 Cost: $175,773 |
$22,467 | 438,991 | $6,996 | 500 | $320 | - | $40,680 | - | $22,467 438,991 kWh |
$6,996 500 kW-months/year |
$320 - $ |
$40,680 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $58,625 Cost: $169,625 |
$21,401 | 418,339 | $7,024 | 502 | $(-480) | - | $30,680 | - | $21,401 418,339 kWh |
$7,024 502 kW-months/year |
$(-480) - $ |
$30,680 - $ |
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | $ | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Personnel Changes | Ancillary Material Cost | Electricity Usage | Electricity Demand | Personnel Changes | Ancillary Material Cost |