IAC logo
IAC Assessment: NL0083
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NL0083
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nebraska–Lincoln
Assessment Year 2023
Principal Product Treated Wastewater
NAICS 221320 - Sewage Treatment Facilities
SIC 4952 - Sewerage Systems
Sales $500,000-$1,000,000
# of Employees 2
Plant Area (Sq.Ft.) 24,488
Annual Production 210,240 Thousand Gallons
Production Hrs. Annual 8,760
Location (State) NE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $63,096 1,232,240 kWh $0.05
Electricity Demand $36,312 2,598 kW-months/year $13.98
Electricity Fees $999 - $ -
Natural Gas $5,078 604 MMBtu $8.40
TOTAL ENERGY COSTS $105,485
RECOMMENDED SAVINGS* $70,463 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $58,625
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost
$ kWh $ kW-months/year $ $ $ $
01: 3.4155 METER WASTE WATER Savings:
$31,255
Cost:
$151,280
$1,255 24,515 - - - - $30,000 - $1,255
24,515
kWh
-
-
kW-months/year
-
-
$
$30,000
-
$
02: 2.4323 USE OPTIMUM SIZE AND CAPACITY EQUIPMENT Savings:
$18,134
Cost:
$8,660
$11,376 222,189 $6,758 483 - - - - $11,376
222,189
kWh
$6,758
483
kW-months/year
-
-
$
-
-
$
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$11,038
Cost:
$4,600
$1,066 20,652 $(-28) (-2) - - $10,000 - $1,066
20,652
kWh
$(-28)
(-2)
kW-months/year
-
-
$
$10,000
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$8,182
Cost:
$4,945
$8,182 160,151 - - - - - - $8,182
160,151
kWh
-
-
kW-months/year
-
-
$
-
-
$
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$854
Cost:
$2,700
$588 11,484 $266 19 - - - - $588
11,484
kWh
$266
19
kW-months/year
-
-
$
-
-
$
06: 3.4131 MINIMIZE CONTAMINATION OF WATER BEFORE TREATMENT Savings:
$800
Cost:
$1,548
- - - - $800 - - - -
-
kWh
-
-
kW-months/year
$800
-
$
-
-
$
07: 3.7391 IMPLEMENT A MAINTENANCE PROGRAM TO KEEP RACKS AND TANKS FREE OF RUST, CRACKS, OR CORROSION Savings:
$200
Cost:
$2,040
- - - - $(-480) - $680 - -
-
kWh
-
-
kW-months/year
$(-480)
-
$
$680
-
$
TOTAL RECOMMENDED Savings:
$70,463
Cost:
$175,773
$22,467 438,991 $6,996 500 $320 - $40,680 - $22,467
438,991
kWh
$6,996
500
kW-months/year
$320
-
$
$40,680
-
$
TOTAL IMPLEMENTED Savings:
$58,625
Cost:
$169,625
$21,401 418,339 $7,024 502 $(-480) - $30,680 - $21,401
418,339
kWh
$7,024
502
kW-months/year
$(-480)
-
$
$30,680
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost