IAC logo
IAC Assessment: NL0095
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NL0095
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nebraska–Lincoln
Assessment Year 2024
Principal Product Vehicle Cabins
NAICS 333120 - Construction Machinery Manufacturing
SIC 3531 - Construction Machinery
Sales $100,000,000-$500,000,000
# of Employees 190
Plant Area (Sq.Ft.) 230,000
Annual Production 6,000 Units
Production Hrs. Annual 4,420
Location (State) MN
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $76,782 1,004,800 kWh $0.08
Electricity Demand $33,365 2,704 kW-months/year $12.34
Electricity Fees $30,131 - $ -
Natural Gas $28,225 3,227 MMBtu $8.75
Other Gas $6,064 1 MMBtu $6,064.00
TOTAL ENERGY COSTS $174,567
RECOMMENDED SAVINGS* $93,613 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Increase in Production Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Increase in Production
$ kWh $ kW-months/year $ $ $ $ $ $ $ %
01: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$65,447
Cost:
$72,000
$970 12,756 $427 35 - - - - - - $64,050 - $970
12,756
kWh
$427
35
kW-months/year
-
-
$
-
-
$
-
-
$
$64,050
-
%
02: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$14,437
Cost:
$500
- - $14,437 1,170 - - - - - - - - -
-
kWh
$14,437
1,170
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
%
03: 2.8121 APPLY FOR TAX-FREE STATUS FOR ENERGY PURCHASES Savings:
$11,145
Cost:
$2,000
- - - - - - - - $11,145 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
$11,145
-
$
-
-
%
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,285
Cost:
$1,500
$2,185 28,750 - - $(-800) - $(-100) - - - - - $2,185
28,750
kWh
-
-
kW-months/year
$(-800)
-
$
$(-100)
-
$
-
-
$
-
-
%
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$652
Cost:
$373
$365 4,803 $139 11 $148 - - - - - - - $365
4,803
kWh
$139
11
kW-months/year
$148
-
$
-
-
$
-
-
$
-
-
%
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$647
Cost:
$2,000
$647 8,509 - - - - - - - - - - $647
8,509
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$93,613
Cost:
$78,373
$4,167 54,818 $15,003 1,216 $(-652) - $(-100) - $11,145 - $64,050 - $4,167
54,818
kWh
$15,003
1,216
kW-months/year
$(-652)
-
$
$(-100)
-
$
$11,145
-
$
$64,050
-
%
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
$
-
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ $ $ $ $ $ $ %
Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Increase in Production Electricity Usage Electricity Demand Personnel Changes Ancillary Material Cost One-time Revenue or Avoided Cost Increase in Production