IAC Assessment: NT0007
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of North Texas
Assessment Year 2023
Principal Product Electric component manufacturing
NAICS 334419 - Other Electronic Component Manufacturing
SIC 3679 - Electronic Components, Nec
Sales $10,000,000-$50,000,000
# of Employees 140
Plant Area (Sq.Ft.) 44,455
Annual Production 720,000 Pieces
Production Hrs. Annual 5,040
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $144,985 1,648,500 kWh $0.09
Electricity Demand $46,821 4,290 kW-months/year $10.91
Electricity Fees $13,965 - $ -
Natural Gas $8,397 746 MMBtu $11.26
TOTAL ENERGY COSTS $214,168
RECOMMENDED SAVINGS* $108,800 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,184
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes
$ kWh $ kW-months/year $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,184
Cost:
$5,993
$4,773 54,298 $1,411 129 - - $4,773
54,298
kWh
$1,411
129
kW-months/year
-
-
$
02: 2.7232 REPLACE EXISTING HVAC UNIT WITH HIGH EFFICIENCY MODEL Savings:
$63,856
Cost:
$337,512
$63,856 726,467 - - - - $63,856
726,467
kWh
-
-
kW-months/year
-
-
$
03: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$22,470
Cost:
-
- - - - $22,470 - -
-
kWh
-
-
kW-months/year
$22,470
-
$
04: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$4,290
Cost:
$5,486
- - $4,290 393 - - -
-
kWh
$4,290
393
kW-months/year
-
-
$
05: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$12,000
Cost:
$7,500
- - - - $12,000 - -
-
kWh
-
-
kW-months/year
$12,000
-
$
TOTAL RECOMMENDED Savings:
$108,800
Cost:
$356,491
$68,629 780,764 $5,701 522 $34,470 - $68,629
780,764
kWh
$5,701
522
kW-months/year
$34,470
-
$
TOTAL IMPLEMENTED Savings:
$6,184
Cost:
$5,993
$4,773 54,298 $1,411 129 - - $4,773
54,298
kWh
$1,411
129
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Administrative Changes Electricity Usage Electricity Demand Administrative Changes