IAC Assessment: NT0013
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NT0013
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of North Texas
Assessment Year 2023
Principal Product Electrical component manufacturing
NAICS 335932 - Noncurrent-Carrying Wiring Device Manufacturing
SIC 3644 - Noncurrent-carrying Wiring Devices
Sales $100,000,000-$500,000,000
# of Employees 283
Plant Area (Sq.Ft.) 500,000
Annual Production 183,443,403 Pounds
Production Hrs. Annual 8,064
Location (State) TX
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $2,280,159 32,417,013 kWh $0.07
Electricity Demand $116,701 10,806 kW-months/year $10.80
Electricity Fees $98 - $ -
Natural Gas $1,223,108 1,035,329 MMBtu $1.18
TOTAL ENERGY COSTS $3,620,066
RECOMMENDED SAVINGS* $873,109 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $863,034
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Administrative Changes One-time Revenue or Avoided Cost
$ kWh $ kW-months/year $ $ $ $
01: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$71,747
Cost:
$106,919
$71,747 1,024,952 - - - - - - $71,747
1,024,952
kWh
-
-
kW-months/year
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,755
Cost:
$21,512
$2,355 33,643 $1,400 130 - - - - $2,355
33,643
kWh
$1,400
130
kW-months/year
-
-
$
-
-
$
03: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$10,076
Cost:
$5,043
- - $10,076 933 - - - - -
-
kWh
$10,076
933
kW-months/year
-
-
$
-
-
$
04: 2.7425 CLEAN OR COLOR ROOF TO REDUCE SOLAR LOAD Savings:
$49,000
Cost:
$83,421
$25,500 364,286 $23,500 2,176 - - - - $25,500
364,286
kWh
$23,500
2,176
kW-months/year
-
-
$
-
-
$
05: 2.8227 ADJUST / MAINTAIN FORK LIFT TRUCKS FOR MOST EFFICIENT OPERATION Savings:
$17,430
Cost:
$54,000
- - - - - - $17,430 - -
-
kWh
-
-
kW-months/year
-
-
$
$17,430
-
$
06: 2.7221 LOWER TEMPERATURE DURING THE WINTER SEASON AND VICE-VERSA Savings:
$1,102
Cost:
-
$1,102 15,740 - - - - - - $1,102
15,740
kWh
-
-
kW-months/year
-
-
$
-
-
$
07: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$720,000
Cost:
$120,000
- - - - $720,000 - - - -
-
kWh
-
-
kW-months/year
$720,000
-
$
-
-
$
TOTAL RECOMMENDED Savings:
$873,109
Cost:
$390,895
$100,704 1,438,621 $34,975 3,239 $720,000 - $17,430 - $100,704
1,438,621
kWh
$34,975
3,239
kW-months/year
$720,000
-
$
$17,430
-
$
TOTAL IMPLEMENTED Savings:
$863,034
Cost:
$385,852
$100,704 1,438,621 $24,900 2,306 $720,000 - $17,430 - $100,704
1,438,621
kWh
$24,900
2,306
kW-months/year
$720,000
-
$
$17,430
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Administrative Changes One-time Revenue or Avoided Cost Electricity Usage Electricity Demand Administrative Changes One-time Revenue or Avoided Cost