IAC logo
IAC Assessment: NV0014
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NV0014
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nevada
Assessment Year 1994
Principal Product Aerosol Paints, Lubricants, and Cleaners.
NAICS n/a
SIC 2851 - Paints And Allied Products
Sales $10,000,000-$50,000,000
# of Employees 80
Plant Area (Sq.Ft.) 150,000
Annual Production 11,000,000 Pieces
Production Hrs. Annual 2,210
Location (State) NV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $125,200 1,449,297 kWh $0.09
Natural Gas $64,207 11,505 MMBtu $5.58
TOTAL ENERGY COSTS $189,407
RECOMMENDED SAVINGS* $15,074 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $7,436
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,613
Cost:
$724
$4,613 58,324 - - $4,613
58,324
kWh
-
-
MMBtu
02: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$5,710
Cost:
$1,540
- - $5,710 1,155 -
-
kWh
$5,710
1,155
MMBtu
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,503
Cost:
$1,059
$1,503 18,464 - - $1,503
18,464
kWh
-
-
MMBtu
04: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$181
Cost:
-
$181 2,345 - - $181
2,345
kWh
-
-
MMBtu
05: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$105
Cost:
$56
- - $105 21 -
-
kWh
$105
21
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$597
Cost:
$100
$597 7,620 - - $597
7,620
kWh
-
-
MMBtu
07: 2.2511 INSULATE BARE EQUIPMENT Savings:
$139
Cost:
$172
- - $139 27 -
-
kWh
$139
27
MMBtu
08: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$2,226
Cost:
$900
- - $2,226 434 -
-
kWh
$2,226
434
MMBtu
TOTAL RECOMMENDED Savings:
$15,074
Cost:
$4,551
$6,894 86,753 $8,180 1,637 $6,894
86,753
kWh
$8,180
1,637
MMBtu
TOTAL IMPLEMENTED Savings:
$7,436
Cost:
$1,724
$5,210 65,944 $2,226 434 $5,210
65,944
kWh
$2,226
434
MMBtu