IAC logo
IAC Assessment: NV0020
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NV0020
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nevada
Assessment Year 1995
Principal Product Concrete Pipes
NAICS n/a
SIC 3272 - Concrete Products, Nec
Sales $1,000,000-$5,000,000
# of Employees 17
Plant Area (Sq.Ft.) 18,400
Annual Production 35,000 Tons
Production Hrs. Annual 2,730
Location (State) NV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $35,630 372,509 kWh $0.10
Natural Gas $18,782 3,620 MMBtu $5.19
TOTAL ENERGY COSTS $54,412
RECOMMENDED SAVINGS* $8,759 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $4,219
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,565
Cost:
$1,264
$1,565 16,413 - - $1,565
16,413
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$183
Cost:
$76
$183 2,052 - - $183
2,052
kWh
-
-
MMBtu
03: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$972
Cost:
$320
- - $972 188 -
-
kWh
$972
188
MMBtu
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$166
Cost:
$44
- - $166 32 -
-
kWh
$166
32
MMBtu
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,416
Cost:
$220
- - $1,416 273 -
-
kWh
$1,416
273
MMBtu
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$2,224
Cost:
$3,088
- - $2,224 429 -
-
kWh
$2,224
429
MMBtu
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,665
Cost:
$200
$1,665 17,585 - - $1,665
17,585
kWh
-
-
MMBtu
08: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$568
Cost:
$180
$568 5,862 - - $568
5,862
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$8,759
Cost:
$5,392
$3,981 41,912 $4,778 922 $3,981
41,912
kWh
$4,778
922
MMBtu
TOTAL IMPLEMENTED Savings:
$4,219
Cost:
$784
$1,665 17,585 $2,554 493 $1,665
17,585
kWh
$2,554
493
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas