Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NV0023
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nevada
Assessment Year 1995
Principal Product Precision Sheet Metal Parts
NAICS n/a
SIC 3444 - Sheet Metalwork
Sales $10,000,000-$50,000,000
# of Employees 167
Plant Area (Sq.Ft.) 19,600
Annual Production 8,000,000 Pieces
Production Hrs. Annual 7,000
Location (State) NV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $100,115 1,415,592 kWh $0.07
Natural Gas $48,827 9,705 MMBtu $5.03
TOTAL ENERGY COSTS $148,942
RECOMMENDED SAVINGS* $48,098 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,218
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.8123 PAY UTILITY BILLS ON TIME Savings:
$1,013
Cost:
-
$1,013 - - - $1,013
-
kWh
-
-
MMBtu
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$5,321
Cost:
$461
$5,321 75,322 - - $5,321
75,322
kWh
-
-
MMBtu
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,781
Cost:
$1,245
- - $1,781 354 -
-
kWh
$1,781
354
MMBtu
04: 2.1122 RE-SIZE CHARGING OPENINGS OR ADD A MOVABLE DOOR ON EQUIPMENT Savings:
$4,488
Cost:
$1,600
- - $4,488 892 -
-
kWh
$4,488
892
MMBtu
05: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$31,162
Cost:
$100,000
- - $31,162 6,194 -
-
kWh
$31,162
6,194
MMBtu
06: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,296
Cost:
$224
$2,296 32,532 - - $2,296
32,532
kWh
-
-
MMBtu
07: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,613
Cost:
$694
$1,613 22,860 - - $1,613
22,860
kWh
-
-
MMBtu
08: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$424
Cost:
$100
$424 5,862 - - $424
5,862
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$48,098
Cost:
$104,324
$10,667 136,576 $37,431 7,440 $10,667
136,576
kWh
$37,431
7,440
MMBtu
TOTAL IMPLEMENTED Savings:
$3,218
Cost:
$1,345
$1,437 5,862 $1,781 354 $1,437
5,862
kWh
$1,781
354
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas