IAC Assessment: NV0030
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NV0030
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nevada
Assessment Year 1995
Principal Product Automitive Camshaft Bearings
NAICS n/a
SIC 3714 - Motor Vehicle Parts And Accessories
Sales $10,000,000-$50,000,000
# of Employees 90
Plant Area (Sq.Ft.) 58,000
Annual Production 14,000,000 Pieces
Production Hrs. Annual 4,368
Location (State) NV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $115,241 1,558,324 kWh $0.07
Natural Gas $102,594 17,450 MMBtu $5.88
TOTAL ENERGY COSTS $217,835
RECOMMENDED SAVINGS* $17,385 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $963
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,268
Cost:
$3,296
$3,268 36,049 - - $3,268
36,049
kWh
-
-
MMBtu
02: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$2,584
Cost:
$100
$2,584 7,913 - - $2,584
7,913
kWh
-
-
MMBtu
03: 2.7243 IMPROVE AIR CIRCULATION WITH DESTRATIFICATION FANS / OTHER METHODS Savings:
$2,433
Cost:
$6,500
- - $2,433 152 -
-
kWh
$2,433
152
MMBtu
04: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$833
Cost:
-
$833 11,430 - - $833
11,430
kWh
-
-
MMBtu
05: 2.7224 REDUCE SPACE CONDITIONING DURING NON-WORKING HOURS Savings:
$963
Cost:
-
- - $963 164 -
-
kWh
$963
164
MMBtu
06: 2.1131 REPAIR FAULTY INSULATION IN FURNACES, BOILERS, ETC Savings:
$564
Cost:
$114
- - $564 96 -
-
kWh
$564
96
MMBtu
07: 2.2426 USE WASTE HEAT FROM FLUE GASES TO HEAT SPACE CONDITIONING AIR Savings:
$6,740
Cost:
$11,490
- - $6,740 1,147 -
-
kWh
$6,740
1,147
MMBtu
TOTAL RECOMMENDED Savings:
$17,385
Cost:
$21,500
$6,685 55,392 $10,700 1,559 $6,685
55,392
kWh
$10,700
1,559
MMBtu
TOTAL IMPLEMENTED Savings:
$963
Cost:
-
- - $963 164 -
-
kWh
$963
164
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas