IAC logo
IAC Assessment: NV0049
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NV0049
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nevada
Assessment Year 1996
Principal Product Expanded Foam Board Insulation
NAICS n/a
SIC 3086 - Plastics Foam Products
Sales $10,000,000-$50,000,000
# of Employees 25
Plant Area (Sq.Ft.) 100,000
Annual Production 5,831 Thousand Feet
Production Hrs. Annual 2,184
Location (State) NV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $35,184 791,032 kWh $0.04
Electricity Demand $29,011 4,355 kW-months/year $6.66
Electricity Fees $1,542 - $ -
Natural Gas $20,297 3,570 MMBtu $5.69
TOTAL ENERGY COSTS $116,797
RECOMMENDED SAVINGS* $32,096 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $3,521
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ gal $ lb
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,748
Cost:
$993
$1,667 37,515 $1,081 162 - - - - - - $1,667
37,515
kWh
$1,081
162
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
02: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$3,267
Cost:
$2,750
- - - - $3,267 575 - - - - -
-
kWh
-
-
kW-months/year
$3,267
575
MMBtu
-
-
gal
-
-
lb
03: 2.2531 RE-SIZE CHARGING OPENINGS OR ADD MOVABLE COVER OR DOOR Savings:
$1,757
Cost:
-
- - - - $1,757 309 - - - - -
-
kWh
-
-
kW-months/year
$1,757
309
MMBtu
-
-
gal
-
-
lb
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$203
Cost:
$128
$203 4,689 - - - - - - - - $203
4,689
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$303
Cost:
$245
$127 2,931 $176 26 - - - - - - $127
2,931
kWh
$176
26
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
06: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$22,560
Cost:
$16,000
- - - - - - - - $22,560 737 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$22,560
737
lb
07: 2.4314 USE SYNTHETIC LUBRICANT Savings:
$1,258
Cost:
-
- - - - - - $1,258 196 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,258
196
gal
-
-
lb
TOTAL RECOMMENDED Savings:
$32,096
Cost:
$20,116
$1,997 45,135 $1,257 188 $5,024 884 $1,258 196 $22,560 737 $1,997
45,135
kWh
$1,257
188
kW-months/year
$5,024
884
MMBtu
$1,258
196
gal
$22,560
737
lb
TOTAL IMPLEMENTED Savings:
$3,521
Cost:
$373
$330 7,620 $176 26 $1,757 309 $1,258 196 - - $330
7,620
kWh
$176
26
kW-months/year
$1,757
309
MMBtu
$1,258
196
gal
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz)