IAC logo
IAC Assessment: NV0055
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NV0055
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nevada
Assessment Year 1996
Principal Product Floral foam
NAICS n/a
SIC 3086 - Plastics Foam Products
Sales n/a
# of Employees 30
Plant Area (Sq.Ft.) 53,000
Annual Production 500,000,000 Units
Production Hrs. Annual 2,210
Location (State) NV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $23,902 550,996 kWh $0.04
Electricity Demand $31,607 3,406 kW-months/year $9.28
Electricity Fees $600 - $ -
Natural Gas $21,203 3,937 MMBtu $5.39
TOTAL ENERGY COSTS $89,562
RECOMMENDED SAVINGS* $15,590 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,239
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$86
Cost:
$63
$31 586 $55 6 - - - - $31
586
kWh
$55
6
kW-months/year
-
-
MMBtu
-
-
lb
02: 2.3137 USE POWER DURING OFF-PEAK PERIODS Savings:
$3,340
Cost:
-
- - $3,340 - - - - - -
-
kWh
$3,340
-
kW-months/year
-
-
MMBtu
-
-
lb
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,239
Cost:
$200
$1,304 30,188 $935 101 - - - - $1,304
30,188
kWh
$935
101
kW-months/year
-
-
MMBtu
-
-
lb
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,970
Cost:
$1,600
- - - - $1,970 379 - - -
-
kWh
-
-
kW-months/year
$1,970
379
MMBtu
-
-
lb
05: 2.4231 REDUCE THE PRESSURE OF COMPRESSED AIR TO THE MINIMUM REQUIRED Savings:
$480
Cost:
-
$480 11,137 - - - - - - $480
11,137
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
06: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$3,395
Cost:
$4,000
- - - - $3,395 653 - - -
-
kWh
-
-
kW-months/year
$3,395
653
MMBtu
-
-
lb
07: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$4,080
Cost:
$8,170
- - - - - - $4,080 840,000 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$4,080
840,000
lb
TOTAL RECOMMENDED Savings:
$15,590
Cost:
$14,033
$1,815 41,911 $4,330 107 $5,365 1,032 $4,080 840,000 $1,815
41,911
kWh
$4,330
107
kW-months/year
$5,365
1,032
MMBtu
$4,080
840,000
lb
TOTAL IMPLEMENTED Savings:
$2,239
Cost:
$200
$1,304 30,188 $935 101 - - - - $1,304
30,188
kWh
$935
101
kW-months/year
-
-
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)