IAC logo
IAC Assessment: NV0065
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NV0065
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nevada
Assessment Year 1996
Principal Product Cement
NAICS n/a
SIC 3241 - Cement, Hydraulic
Sales $50,000,000-$100,000,000
# of Employees 122
Plant Area (Sq.Ft.) 240,000
Annual Production 600,000 Tons
Production Hrs. Annual 8,760
Location (State) NV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $3,083,421 72,909,145 kWh $0.04
Electricity Demand $1,095,111 122,220 kW-months/year $8.96
Electricity Fees $(-477,748) - $ -
Natural Gas $1,799,543 2,190,748 MMBtu $0.82
TOTAL ENERGY COSTS $9,100,327
RECOMMENDED SAVINGS* $259,427 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $17,298
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Gaseous Waste Electricity Usage Electricity Demand Gaseous Waste
$ kWh $ kW-months/year $ lb
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$16,835
Cost:
$3,582
$13,050 308,324 $3,785 422 - - $13,050
308,324
kWh
$3,785
422
kW-months/year
-
-
lb
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$12,129
Cost:
$650
$12,129 286,635 - - - - $12,129
286,635
kWh
-
-
kW-months/year
-
-
lb
03: 2.7144 INSTALL SPECTRAL REFLECTORS / DELAMP Savings:
$463
Cost:
$25
$222 5,275 $241 27 - - $222
5,275
kWh
$241
27
kW-months/year
-
-
lb
04: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$230,000
Cost:
$40,000
- - - - $230,000 195,000,000 -
-
kWh
-
-
kW-months/year
$230,000
195,000,000
lb
TOTAL RECOMMENDED Savings:
$259,427
Cost:
$44,257
$25,401 600,234 $4,026 449 $230,000 195,000,000 $25,401
600,234
kWh
$4,026
449
kW-months/year
$230,000
195,000,000
lb
TOTAL IMPLEMENTED Savings:
$17,298
Cost:
$3,607
$13,272 313,599 $4,026 449 - - $13,272
313,599
kWh
$4,026
449
kW-months/year
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ lb
Electricity Usage Electricity Demand Gaseous Waste Electricity Usage Electricity Demand Gaseous Waste