IAC Assessment: NV0068
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NV0068
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nevada
Assessment Year 1996
Principal Product Hot Water Heaters
NAICS n/a
SIC 3443 - Fabricated Plate Work (boiler Shops)
Sales $50,000,000-$100,000,000
# of Employees 280
Plant Area (Sq.Ft.) 144,000
Annual Production 364,000 Pieces
Production Hrs. Annual 5,070
Location (State) NV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $315,067 4,511,430 kWh $0.07
Electricity Demand $97,975 10,583 kW-months/year $9.26
Electricity Fees $6,670 - $ -
Natural Gas $302,385 64,137 MMBtu $4.71
TOTAL ENERGY COSTS $734,447
RECOMMENDED SAVINGS* $277,193 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $264,681
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,203
Cost:
$200
$1,203 26,377 - - - - - - - - $1,203
26,377
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
02: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$121
Cost:
$100
$121 1,758 - - - - - - - - $121
1,758
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.2511 INSULATE BARE EQUIPMENT Savings:
$202
Cost:
$460
$202 1,465 - - - - - - - - $202
1,465
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$6,568
Cost:
-
$6,568 143,318 - - - - - - - - $6,568
143,318
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$4,439
Cost:
$1,505
$1,677 36,635 $2,762 298 - - - - - - $1,677
36,635
kWh
$2,762
298
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
06: 2.2449 RECOVER HEAT FROM EXHAUSTED STEAM, HOT AIR OR HOT WATER Savings:
$12,310
Cost:
$850
- - - - $12,310 2,641 - - - - -
-
kWh
-
-
kW-months/year
$12,310
2,641
MMBtu
-
-
lb
-
-
$
07: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$240,000
Cost:
$600,000
- - - - - - - - $240,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$240,000
-
$
08: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$12,350
Cost:
$15,000
- - - - - - $12,350 32,240 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$12,350
32,240
lb
-
-
$
TOTAL RECOMMENDED Savings:
$277,193
Cost:
$618,115
$9,771 209,553 $2,762 298 $12,310 2,641 $12,350 32,240 $240,000 - $9,771
209,553
kWh
$2,762
298
kW-months/year
$12,310
2,641
MMBtu
$12,350
32,240
lb
$240,000
-
$
TOTAL IMPLEMENTED Savings:
$264,681
Cost:
$616,805
$9,569 208,088 $2,762 298 - - $12,350 32,240 $240,000 - $9,569
208,088
kWh
$2,762
298
kW-months/year
-
-
MMBtu
$12,350
32,240
lb
$240,000
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Personnel Changes