IAC logo
IAC Assessment: NV0073
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NV0073
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nevada
Assessment Year 1996
Principal Product Bottled Soft Drinks
NAICS n/a
SIC 2086 - Bottled And Canned Soft Drinks
Sales $10,000,000-$50,000,000
# of Employees 190
Plant Area (Sq.Ft.) 140,000
Annual Production 6,000,000 Units
Production Hrs. Annual 4,680
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $184,283 3,155,627 kWh $0.06
Electricity Demand $71,982 9,412 kW-months/year $7.65
Electricity Fees $17,241 - $ -
Natural Gas $18,411 3,460 MMBtu $5.32
TOTAL ENERGY COSTS $292,430
RECOMMENDED SAVINGS* $17,347 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $15,115
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Water Disposal Electricity Usage Electricity Demand Water Disposal
$ kWh $ kW-months/year $ Tgal
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$366
Cost:
$100
$366 6,155 - - - - $366
6,155
kWh
-
-
kW-months/year
-
-
Tgal
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$823
Cost:
$208
$573 9,965 $250 33 - - $573
9,965
kWh
$250
33
kW-months/year
-
-
Tgal
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$863
Cost:
$163
$689 11,723 $174 45 - - $689
11,723
kWh
$174
45
kW-months/year
-
-
Tgal
04: 2.7134 USE PHOTOCELL CONTROLS Savings:
$10,850
Cost:
$860
$5,197 89,097 $5,653 739 - - $5,197
89,097
kWh
$5,653
739
kW-months/year
-
-
Tgal
05: 2.6231 UTILIZE CONTROLS TO OPERATE EQUIPMENT ONLY WHEN NEEDED Savings:
$1,700
Cost:
$2,000
$1,700 29,015 - - - - $1,700
29,015
kWh
-
-
kW-months/year
-
-
Tgal
06: 2.6212 TURN OFF EQUIPMENT DURING BREAKS, REDUCE OPERATING TIME Savings:
$630
Cost:
$700
$630 10,844 - - - - $630
10,844
kWh
-
-
kW-months/year
-
-
Tgal
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$881
Cost:
$310
$881 15,240 - - - - $881
15,240
kWh
-
-
kW-months/year
-
-
Tgal
08: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$721
Cost:
$69
$554 25,791 $167 66 - - $554
25,791
kWh
$167
66
kW-months/year
-
-
Tgal
09: 3.4151 MINIMIZE WATER USAGE Savings:
$513
Cost:
-
- - - - $513 442,320 -
-
kWh
-
-
kW-months/year
$513
442,320
Tgal
TOTAL RECOMMENDED Savings:
$17,347
Cost:
$4,410
$10,590 197,830 $6,244 883 $513 442,320 $10,590
197,830
kWh
$6,244
883
kW-months/year
$513
442,320
Tgal
TOTAL IMPLEMENTED Savings:
$15,115
Cost:
$3,331
$8,525 145,955 $6,077 817 $513 442,320 $8,525
145,955
kWh
$6,077
817
kW-months/year
$513
442,320
Tgal
Savings
Cost
$ kWh $ kW-months/year $ Tgal
Electricity Usage Electricity Demand Water Disposal Electricity Usage Electricity Demand Water Disposal