IAC logo
IAC Assessment: NV0076
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NV0076
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nevada
Assessment Year 1997
Principal Product Steel Reloading Dies
NAICS n/a
SIC 3559 - Special Industry Machinery, Nec
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 105,000
Annual Production 700,000 Pieces
Production Hrs. Annual 3,744
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $211,862 2,487,104 kWh $0.09
Electricity Demand $33,666 7,904 kW-months/year $4.26
Electricity Fees $12,678 - $ -
Natural Gas $34,095 6,393 MMBtu $5.33
TOTAL ENERGY COSTS $292,301
RECOMMENDED SAVINGS* $57,465 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $1,295
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz)
$ kWh $ kW-months/year $ MMBtu $ gal
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$134
Cost:
$37
$117 10,844 $17 4 - - - - $117
10,844
kWh
$17
4
kW-months/year
-
-
MMBtu
-
-
gal
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,161
Cost:
$300
$1,161 13,775 - - - - - - $1,161
13,775
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$729
Cost:
$327
$649 7,620 $80 19 - - - - $649
7,620
kWh
$80
19
kW-months/year
-
-
MMBtu
-
-
gal
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,956
Cost:
$1,911
$8,581 100,821 $1,375 323 - - - - $8,581
100,821
kWh
$1,375
323
kW-months/year
-
-
MMBtu
-
-
gal
05: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$5,980
Cost:
$800
$5,180 60,961 $800 188 - - - - $5,180
60,961
kWh
$800
188
kW-months/year
-
-
MMBtu
-
-
gal
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$7,229
Cost:
$4,000
- - - - $7,229 1,213 - - -
-
kWh
-
-
kW-months/year
$7,229
1,213
MMBtu
-
-
gal
07: 3.8141 REGENERATE CLEANING SOLVENT ON-SITE AND REUSE Savings:
$30,371
Cost:
$47,825
- - - - - - $30,371 8,034 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$30,371
8,034
gal
08: 3.4155 METER WASTE WATER Savings:
$1,905
Cost:
$4,000
- - - - - - $1,905 1,500 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,905
1,500
gal
TOTAL RECOMMENDED Savings:
$57,465
Cost:
$59,200
$15,688 194,021 $2,272 534 $7,229 1,213 $32,276 9,534 $15,688
194,021
kWh
$2,272
534
kW-months/year
$7,229
1,213
MMBtu
$32,276
9,534
gal
TOTAL IMPLEMENTED Savings:
$1,295
Cost:
$337
$1,278 24,619 $17 4 - - - - $1,278
24,619
kWh
$17
4
kW-months/year
-
-
MMBtu
-
-
gal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz)