IAC Assessment: NV0082
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NV0082
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nevada
Assessment Year 1997
Principal Product Western Jewelry
NAICS n/a
SIC 3961 - Costume Jewelry
Sales $5,000,000-$10,000,000
# of Employees 60
Plant Area (Sq.Ft.) 15,000
Annual Production 195,000 Pieces
Production Hrs. Annual 2,184
Location (State) NV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $40,079 916,471 kWh $0.04
Electricity Demand $31,301 3,373 kW-months/year $9.28
Electricity Fees $339 - $ -
Natural Gas $24,854 4,787 MMBtu $5.19
TOTAL ENERGY COSTS $96,573
RECOMMENDED SAVINGS* $72,219 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,198
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Personnel Changes Administrative Changes Electricity Usage Electricity Demand Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ $ $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,055
Cost:
$232
$487 11,137 $568 61 - - - - $487
11,137
kWh
$568
61
kW-months/year
-
-
$
-
-
$
02: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$761
Cost:
$125
$351 7,913 $410 44 - - - - $351
7,913
kWh
$410
44
kW-months/year
-
-
$
-
-
$
03: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$135
Cost:
$163
$71 1,758 $64 7 - - - - $71
1,758
kWh
$64
7
kW-months/year
-
-
$
-
-
$
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$122
Cost:
$200
$122 2,931 - - - - - - $122
2,931
kWh
-
-
kW-months/year
-
-
$
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$340
Cost:
$592
$274 6,155 $66 7 - - - - $274
6,155
kWh
$66
7
kW-months/year
-
-
$
-
-
$
06: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,179
Cost:
$1,154
$1,179 14,947 - - - - - - $1,179
14,947
kWh
-
-
kW-months/year
-
-
$
-
-
$
07: 2.2514 COVER OPEN TANKS Savings:
$897
Cost:
$375
$444 10,258 $453 49 - - - - $444
10,258
kWh
$453
49
kW-months/year
-
-
$
-
-
$
08: 4.425 ELIMINATE/REDUCE REDUNDANT INSPECTIONS Savings:
$66,700
Cost:
$25,000
- - - - $66,700 - - - -
-
kWh
-
-
kW-months/year
$66,700
-
$
-
-
$
09: 4.821 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$1,030
Cost:
-
- - - - - - $1,030 - -
-
kWh
-
-
kW-months/year
-
-
$
$1,030
-
$
TOTAL RECOMMENDED Savings:
$72,219
Cost:
$27,841
$2,928 55,099 $1,561 168 $66,700 - $1,030 - $2,928
55,099
kWh
$1,561
168
kW-months/year
$66,700
-
$
$1,030
-
$
TOTAL IMPLEMENTED Savings:
$2,198
Cost:
$1,729
$1,745 28,136 $453 49 - - - - $1,745
28,136
kWh
$453
49
kW-months/year
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ $
Electricity Usage Electricity Demand Personnel Changes Administrative Changes Electricity Usage Electricity Demand Personnel Changes Administrative Changes