Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Nevada |
---|---|
Assessment Year | 1997 |
Principal Product | Precision Fluid Measuring Devices |
NAICS | n/a |
SIC | 3841 - Surgical And Medical Instruments |
Sales | $10,000,000-$50,000,000 |
# of Employees | 385 |
Plant Area (Sq.Ft.) | 221,000 |
Annual Production | 360,000 Pieces |
Production Hrs. Annual | 4,862 |
Location (State) | NV |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $130,996 | 2,920,574 | kWh | $0.04 |
Electricity Demand | $76,792 | 8,275 | kW-months/year | $9.28 |
Electricity Fees | $(-2,280) | - | $ | - |
Natural Gas | $48,841 | 9,334 | MMBtu | $5.23 |
TOTAL ENERGY COSTS | $254,349 | |||
RECOMMENDED SAVINGS* | $47,389 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $5,491 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Administrative Changes | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES |
Savings: $464 Cost: $200 |
$464 | 10,258 | - | - | - | - | - | - | - | - |
$464 10,258 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS |
Savings: $219 Cost: $196 |
$145 | 3,224 | $74 | 8 | - | - | - | - | - | - |
$145 3,224 kWh |
$74 8 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS |
Savings: $26,223 Cost: $6,283 |
$17,378 | 386,284 | $8,845 | 953 | - | - | - | - | - | - |
$17,378 386,284 kWh |
$8,845 953 kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $701 Cost: $400 |
$701 | 15,533 | - | - | - | - | - | - | - | - |
$701 15,533 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT |
Savings: $1,705 Cost: $2,850 |
- | - | - | - | $1,705 | 335 | - | - | - | - |
- - kWh |
- - kW-months/year |
$1,705 335 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 2.2523 REDUCE INFILTRATION TO REFRIGERATED AREAS; ISOLATE HOT EQUIPMENT FROM REFRIGERATED AREAS |
Savings: $2,994 Cost: $2,830 |
- | - | - | - | $2,994 | 588 | - | - | - | - |
- - kWh |
- - kW-months/year |
$2,994 588 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
07: 2.7124 MAKE A PRACTICE OF TURNING OFF LIGHTS WHEN NOT NEEDED |
Savings: $6,431 Cost: $1,520 |
- | - | - | - | $6,431 | 1,260 | - | - | - | - |
- - kWh |
- - kW-months/year |
$6,431 1,260 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
08: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $127 Cost: $159 |
$127 | 2,931 | - | - | - | - | - | - | - | - |
$127 2,931 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
09: 2.2514 COVER OPEN TANKS |
Savings: $937 Cost: $188 |
- | - | $492 | 53 | $445 | 34 | - | - | - | - |
- - kWh |
$492 53 kW-months/year |
$445 34 MMBtu |
- - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
10: 3.5311 RECOVER AND REUSE WASTE MATERIAL |
Savings: $6,250 Cost: $500 |
- | - | - | - | - | - | $6,250 | - | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$6,250 - lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
11: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE |
Savings: $1,000 Cost: $150 |
- | - | - | - | - | - | $1,000 | 30,060 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$1,000 30,060 lb |
- - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
12: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS |
Savings: $338 Cost: $147 |
- | - | - | - | - | - | - | - | $338 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$338 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $47,389 Cost: $15,423 |
$18,815 | 418,230 | $9,411 | 1,014 | $11,575 | 2,217 | $7,250 | 30,060 | $338 | - | $18,815 418,230 kWh |
$9,411 1,014 kW-months/year |
$11,575 2,217 MMBtu |
$7,250 30,060 lb |
$338 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $5,491 Cost: $4,290 |
$1,437 | 31,946 | $566 | 61 | $2,150 | 369 | $1,000 | 30,060 | $338 | - | $1,437 31,946 kWh |
$566 61 kW-months/year |
$2,150 369 MMBtu |
$1,000 30,060 lb |
$338 - $ |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | $ | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Administrative Changes | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Administrative Changes |