IAC Assessment: NV0086
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NV0086
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nevada
Assessment Year 1997
Principal Product Fermented Olivers
NAICS n/a
SIC 2035 - Pickles, Sauces, And Salad Dressings
Sales $1,000,000-$5,000,000
# of Employees 18
Plant Area (Sq.Ft.) 115,200
Annual Production 960 Tons
Production Hrs. Annual 2,431
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $12,391 152,110 kWh $0.08
Electricity Demand $4,501 1,009 kW-months/year $4.46
Electricity Fees $2,520 - $ -
Natural Gas $632 85 MMBtu $7.44
TOTAL ENERGY COSTS $20,044
RECOMMENDED SAVINGS* $101,543 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $57,131
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Primary Product By-product Production Increase in Production Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Primary Product By-product Production Increase in Production
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ %
01: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$596
Cost:
$180
$288 2,345 - - $308 55 - - - - - - - - $288
2,345
kWh
-
-
kW-months/year
$308
55
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
%
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$320
Cost:
$368
$237 2,931 $83 19 - - - - - - - - - - $237
2,931
kWh
$83
19
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
%
03: 2.7111 REDUCE ILLUMINATION TO MINIMUM NECESSARY LEVELS Savings:
$2,051
Cost:
$225
$1,615 19,930 $436 98 - - - - - - - - - - $1,615
19,930
kWh
$436
98
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
%
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$2,116
Cost:
$526
$1,758 21,688 $358 80 - - - - - - - - - - $1,758
21,688
kWh
$358
80
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
%
05: 3.5212 REGRIND, REUSE, OR SELL SCRAP PLASTIC PARTS Savings:
$2,500
Cost:
$49
- - - - - - - - - - $2,500 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
$2,500
-
$
-
-
%
06: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$8,565
Cost:
$7,860
- - - - - - - - $8,565 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$8,565
-
$
-
-
$
-
-
%
07: 4.425 ELIMINATE/REDUCE REDUNDANT INSPECTIONS Savings:
$8,845
Cost:
$4,800
- - - - - - - - $8,845 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$8,845
-
$
-
-
$
-
-
%
08: 4.445 INSTALL EQUIPMENT TO MOVE PRODUCT Savings:
$34,460
Cost:
$12,000
- - - - - - - - $34,460 - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$34,460
-
$
-
-
$
-
-
%
09: 4.122 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$41,700
Cost:
$650
- - - - - - - - - - - - $41,700 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
$41,700
-
%
10: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$390
Cost:
$300
- - - - - - $390 260 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$390
260
lb
-
-
$
-
-
$
-
-
%
TOTAL RECOMMENDED Savings:
$101,543
Cost:
$26,958
$3,898 46,894 $877 197 $308 55 $390 260 $51,870 - $2,500 - $41,700 - $3,898
46,894
kWh
$877
197
kW-months/year
$308
55
MMBtu
$390
260
lb
$51,870
-
$
$2,500
-
$
$41,700
-
%
TOTAL IMPLEMENTED Savings:
$57,131
Cost:
$25,602
$1,852 22,861 $519 117 - - $390 260 $51,870 - $2,500 - - - $1,852
22,861
kWh
$519
117
kW-months/year
-
-
MMBtu
$390
260
lb
$51,870
-
$
$2,500
-
$
-
-
%
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $ $ $ $ %
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Primary Product By-product Production Increase in Production Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Primary Product By-product Production Increase in Production