IAC logo
IAC Assessment: NV0104
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NV0104
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nevada
Assessment Year 1998
Principal Product Concrete Products
NAICS n/a
SIC 3272 - Concrete Products, Nec
Sales $5,000,000-$10,000,000
# of Employees 68
Plant Area (Sq.Ft.) 107,267
Annual Production 709 Thousand Feet
Production Hrs. Annual 2,300
Location (State) NV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $23,036 541,325 kWh $0.04
Electricity Demand $21,944 4,462 kW-months/year $4.92
Electricity Fees $4,572 - $ -
Natural Gas $34,037 6,568 MMBtu $5.18
TOTAL ENERGY COSTS $84,260
RECOMMENDED SAVINGS* $86,780 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $13,857
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Administrative Changes
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$867
Cost:
$2,852
$585 13,775 $264 54 $18 - - - - - - - $585
13,775
kWh
$264
54
kW-months/year
$18
-
$
-
-
MMBtu
-
-
$
-
-
$
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,970
Cost:
$9,180
$1,205 28,429 $726 148 $39 - - - - - - - $1,205
28,429
kWh
$726
148
kW-months/year
$39
-
$
-
-
MMBtu
-
-
$
-
-
$
03: 2.1224 REPLACE BOILER Savings:
$12,990
Cost:
$48,188
- - - - - - $12,990 2,520 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$12,990
2,520
MMBtu
-
-
$
-
-
$
04: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$746
Cost:
$257
- - - - - - $746 145 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$746
145
MMBtu
-
-
$
-
-
$
05: 4.8210 PAY BILLS ON TIME TO AVOID LATE FEES Savings:
$3,385
Cost:
$750
- - - - - - - - - - $3,385 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
$3,385
-
$
06: 4.6520 REPLACE EXISTING EQUIPMENT WITH MORE SUITABLE SUBSTITUTES Savings:
$60,255
Cost:
$34,840
- - - - - - - - $60,255 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$60,255
-
$
-
-
$
07: 4.2110 CONSIDER USE / PURCHASE OF BULK MATERIALS WHERE POSSIBLE Savings:
$6,567
Cost:
$1,500
- - - - - - - - - - $6,567 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
$6,567
-
$
TOTAL RECOMMENDED Savings:
$86,780
Cost:
$97,567
$1,790 42,204 $990 202 $57 - $13,736 2,665 $60,255 - $9,952 - $1,790
42,204
kWh
$990
202
kW-months/year
$57
-
$
$13,736
2,665
MMBtu
$60,255
-
$
$9,952
-
$
TOTAL IMPLEMENTED Savings:
$13,857
Cost:
$51,040
$585 13,775 $264 54 $18 - $12,990 2,520 - - - - $585
13,775
kWh
$264
54
kW-months/year
$18
-
$
$12,990
2,520
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Administrative Changes Electricity Usage Electricity Demand Electricity Fees Natural Gas Personnel Changes Administrative Changes