IAC logo
IAC Assessment: NV0106
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NV0106
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nevada
Assessment Year 1998
Principal Product Slurry Valves and Feeders
NAICS n/a
SIC 3494 - Valves And Pipe Fittings, Nec
Sales $10,000,000-$50,000,000
# of Employees 105
Plant Area (Sq.Ft.) 47,000
Annual Production 7,330 Pieces
Production Hrs. Annual 6,266
Location (State) NV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $59,354 1,422,333 kWh $0.04
Electricity Demand $35,032 3,775 kW-months/year $9.28
Electricity Fees $2,500 - $ -
Natural Gas $26,330 5,073 MMBtu $5.19
TOTAL ENERGY COSTS $124,340
RECOMMENDED SAVINGS* $23,313 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $11,109
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Solid Waste (non-haz) Solid Waste (haz) Water Consumption Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Solid Waste (non-haz) Solid Waste (haz) Water Consumption
$ kWh $ kW-months/year $ $ $ MMBtu $ gal $ lb $ lb $ Tgal
01: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$388
Cost:
$210
- - - - - - $388 75 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$388
75
MMBtu
-
-
gal
-
-
lb
-
-
lb
-
-
Tgal
02: 2.2515 USE OPTIMUM THICKNESS INSULATION Savings:
$304
Cost:
$370
- - - - - - $304 82 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$304
82
MMBtu
-
-
gal
-
-
lb
-
-
lb
-
-
Tgal
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$4,070
Cost:
$13,450
$2,798 67,116 $1,192 128 $80 - - - - - - - - - - - $2,798
67,116
kWh
$1,192
128
kW-months/year
$80
-
$
-
-
MMBtu
-
-
gal
-
-
lb
-
-
lb
-
-
Tgal
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$162
Cost:
-
$114 2,638 $45 7 $3 - - - - - - - - - - - $114
2,638
kWh
$45
7
kW-months/year
$3
-
$
-
-
MMBtu
-
-
gal
-
-
lb
-
-
lb
-
-
Tgal
05: 3.1161 ELIMINATE/REDUCE AN OPERATION Savings:
$9,796
Cost:
-
- - - - - - - - $9,796 240 - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$9,796
240
gal
-
-
lb
-
-
lb
-
-
Tgal
06: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS Savings:
$1,753
Cost:
$4,700
- - - - - - - - - - $1,753 5,170 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
$1,753
5,170
lb
-
-
lb
-
-
Tgal
07: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$521
Cost:
$243
- - - - - - - - - - - - - - $521 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
lb
-
-
lb
$521
-
Tgal
08: 3.5314 USE IN-PROCESS RECYCLING WHENEVER POSSIBLE Savings:
$327
Cost:
$50
- - - - - - - - - - $327 8,960 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
$327
8,960
lb
-
-
lb
-
-
Tgal
09: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$986
Cost:
-
- - - - - - - - - - $986 2,400 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
$986
2,400
lb
-
-
lb
-
-
Tgal
10: 3.5316 CONTRACT A WOOD PALLET RECYCLING COMPANY Savings:
$711
Cost:
-
- - - - - - - - - - $711 7,200 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
$711
7,200
lb
-
-
lb
-
-
Tgal
11: 3.7131 USE A RAG RECYCLE SERVICE Savings:
$4,295
Cost:
-
- - - - - - - - - - - - $4,295 8,900 - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
gal
-
-
lb
$4,295
8,900
lb
-
-
Tgal
TOTAL RECOMMENDED Savings:
$23,313
Cost:
$19,023
$2,912 69,754 $1,237 135 $83 - $692 157 $9,796 240 $3,777 23,730 $4,295 8,900 $521 - $2,912
69,754
kWh
$1,237
135
kW-months/year
$83
-
$
$692
157
MMBtu
$9,796
240
gal
$3,777
23,730
lb
$4,295
8,900
lb
$521
-
Tgal
TOTAL IMPLEMENTED Savings:
$11,109
Cost:
$50
- - - - - - - - $9,796 240 $1,313 11,360 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$9,796
240
gal
$1,313
11,360
lb
-
-
lb
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ gal $ lb $ lb $ Tgal
Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Solid Waste (non-haz) Solid Waste (haz) Water Consumption Electricity Usage Electricity Demand Electricity Fees Natural Gas Other Liquid (haz) Solid Waste (non-haz) Solid Waste (haz) Water Consumption