IAC Assessment: NV0111
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NV0111
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nevada
Assessment Year 1998
Principal Product Lithium Products
NAICS n/a
SIC 2819 - Industrial Inorganic Chemicals, Nec
Sales $10,000,000-$50,000,000
# of Employees 76
Plant Area (Sq.Ft.) 50,740
Annual Production 13,000,000 Pounds
Production Hrs. Annual 7,200
Location (State) NV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $808,985 19,846,718 kWh $0.04
Electricity Demand $303,918 31,778 kW-months/year $9.56
Electricity Fees $(-47,655) - $ -
LPG $60,935 10,484 MMBtu $5.81
Fuel Oil #6 $468,772 118,539 MMBtu $3.95
TOTAL ENERGY COSTS $1,594,955
RECOMMENDED SAVINGS* $179,459 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $16,660
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Fuel Oil #6 Electricity Usage Electricity Demand Electricity Fees Fuel Oil #6
$ kWh $ kW-months/year $ $ $ MMBtu
01: 2.1213 DIRECT WARMEST AIR TO COMBUSTION INTAKE Savings:
$12,730
Cost:
$690
- - - - - - $12,730 3,219 -
-
kWh
-
-
kW-months/year
-
-
$
$12,730
3,219
MMBtu
02: 2.2136 INSTALL / REPAIR INSULATION ON STEAM LINES Savings:
$1,601
Cost:
$1,601
- - - - - - $1,601 208 -
-
kWh
-
-
kW-months/year
-
-
$
$1,601
208
MMBtu
03: 2.2427 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT INCOMING FLUIDS Savings:
$56,930
Cost:
$114,658
- - - - - - $56,930 14,396 -
-
kWh
-
-
kW-months/year
-
-
$
$56,930
14,396
MMBtu
04: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,752
Cost:
$3,018
- - - - - - $1,752 443 -
-
kWh
-
-
kW-months/year
-
-
$
$1,752
443
MMBtu
05: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$72,779
Cost:
$121,406
$63,174 1,551,290 $13,436 1,397 $(-3,831) - - - $63,174
1,551,290
kWh
$13,436
1,397
kW-months/year
$(-3,831)
-
$
-
-
MMBtu
06: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$8,416
Cost:
$7,755
$6,593 116,940 $2,170 226 $(-347) - - - $6,593
116,940
kWh
$2,170
226
kW-months/year
$(-347)
-
$
-
-
MMBtu
07: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$2,329
Cost:
$607
$1,760 43,083 $692 72 $(-123) - - - $1,760
43,083
kWh
$692
72
kW-months/year
$(-123)
-
$
-
-
MMBtu
08: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$22,922
Cost:
$48,995
$18,418 341,442 $5,473 567 $(-969) - - - $18,418
341,442
kWh
$5,473
567
kW-months/year
$(-969)
-
$
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$179,459
Cost:
$298,730
$89,945 2,052,755 $21,771 2,262 $(-5,270) - $73,013 18,266 $89,945
2,052,755
kWh
$21,771
2,262
kW-months/year
$(-5,270)
-
$
$73,013
18,266
MMBtu
TOTAL IMPLEMENTED Savings:
$16,660
Cost:
$2,898
$1,760 43,083 $692 72 $(-123) - $14,331 3,427 $1,760
43,083
kWh
$692
72
kW-months/year
$(-123)
-
$
$14,331
3,427
MMBtu
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu
Electricity Usage Electricity Demand Electricity Fees Fuel Oil #6 Electricity Usage Electricity Demand Electricity Fees Fuel Oil #6