Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center | University of Nevada |
---|---|
Assessment Year | 1999 |
Principal Product | Fluid Power Valves |
NAICS | n/a |
SIC | 3492 - Fluid Power Valves & Hose Fittings |
Sales | $5,000,000-$10,000,000 |
# of Employees | 62 |
Plant Area (Sq.Ft.) | 38,000 |
Annual Production | 24,016 Pieces |
Production Hrs. Annual | 6,084 |
Location (State) | NV |
Source | Yearly Cost | Usage | Unit | Unit Cost |
---|---|---|---|---|
Electricity Usage | $22,218 | 532,532 | kWh | $0.04 |
Electricity Demand | $16,583 | 1,787 | kW-months/year | $9.28 |
Electricity Fees | $600 | - | $ | - |
Natural Gas | $2,521 | 362 | MMBtu | $6.96 |
TOTAL ENERGY COSTS | $41,922 | |||
RECOMMENDED SAVINGS* | $101,373 | *Non-energy impacts included in savings. See recommendations below |
||
IMPLEMENTED SAVINGS* | $97,006 |
#|Description |
Savings Cost |
Status | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Increase in Production | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Increase in Production | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | % | ||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
01: 2.1311 REPLACE ELECTRICALLY-OPERATED EQUIPMENT WITH FOSSIL FUEL EQUIPMENT |
Savings: $3,858 Cost: $7,243 |
$3,916 | 93,787 | $1,359 | 146 | $(-1,417) | (-225) | - | - | - | - |
$3,916 93,787 kWh |
$1,359 146 kW-months/year |
$(-1,417) (-225) MMBtu |
- - lb |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
02: 2.2511 INSULATE BARE EQUIPMENT |
Savings: $1,150 Cost: $800 |
$1,150 | 15,533 | - | - | - | - | - | - | - | - |
$1,150 15,533 kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
03: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS |
Savings: $292 Cost: $135 |
$155 | 3,810 | $137 | 15 | - | - | - | - | - | - |
$155 3,810 kWh |
$137 15 kW-months/year |
- - MMBtu |
- - lb |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS |
Savings: $2,617 Cost: $8,520 |
$1,819 | 43,669 | $798 | 86 | - | - | - | - | - | - |
$1,819 43,669 kWh |
$798 86 kW-months/year |
- - MMBtu |
- - lb |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
05: 3.1191 CHANGE PROCEDURES / EQUIPMENT / OPERATING CONDITIONS |
Savings: $308 Cost: $175 |
- | - | - | - | - | - | $308 | 256 | - | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
$308 256 lb |
- - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
06: 4.422 UTILIZE OUTSIDE CONTRACTING |
Savings: $93,148 Cost: - |
- | - | - | - | - | - | - | - | $93,148 | - |
- - kWh |
- - kW-months/year |
- - MMBtu |
- - lb |
$93,148 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL RECOMMENDED |
Savings: $101,373 Cost: $16,873 |
$7,040 | 156,799 | $2,294 | 247 | $(-1,417) | (-225) | $308 | 256 | $93,148 | - | $7,040 156,799 kWh |
$2,294 247 kW-months/year |
$(-1,417) (-225) MMBtu |
$308 256 lb |
$93,148 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
TOTAL IMPLEMENTED |
Savings: $97,006 Cost: $7,243 |
$3,916 | 93,787 | $1,359 | 146 | $(-1,417) | (-225) | - | - | $93,148 | - | $3,916 93,787 kWh |
$1,359 146 kW-months/year |
$(-1,417) (-225) MMBtu |
- - lb |
$93,148 - % |
|||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Savings Cost |
$ | kWh | $ | kW-months/year | $ | MMBtu | $ | lb | $ | % | |||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Increase in Production | Electricity Usage | Electricity Demand | Natural Gas | Solid Waste (non-haz) | Increase in Production |