IAC Assessment: NV0145
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NV0145
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nevada
Assessment Year 1999
Principal Product Moulded Wood Products
NAICS n/a
SIC 2431 - Millwork
Sales $10,000,000-$50,000,000
# of Employees 133
Plant Area (Sq.Ft.) 134,300
Annual Production 14,904,954 Units
Production Hrs. Annual 4,394
Location (State) CA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $239,161 3,627,491 kWh $0.07
Electricity Demand $120,405 11,141 kW-months/year $10.81
Electricity Fees $14,339 - $ -
LPG $36,576 5,482 MMBtu $6.67
Fuel Oil #4 $2,422 438 MMBtu $5.53
TOTAL ENERGY COSTS $412,903
RECOMMENDED SAVINGS* $78,746 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $51,413
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees LPG Solid Waste (non-haz) Administrative Changes Primary Product Increase in Production Electricity Usage Electricity Demand Electricity Fees LPG Solid Waste (non-haz) Administrative Changes Primary Product Increase in Production
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $ $ $ $ %
01: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$3,135
Cost:
$5,200
- - - - - - $3,135 479 - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$3,135
479
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
%
02: 2.3212 OPTIMIZE PLANT POWER FACTOR Savings:
$5,157
Cost:
$5,200
$5,157 33,118 - - - - - - - - - - - - - - $5,157
33,118
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
%
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,181
Cost:
$3,707
$1,973 31,946 $1,127 88 $81 - - - - - - - - - - - $1,973
31,946
kWh
$1,127
88
kW-months/year
$81
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
%
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$3,220
Cost:
$1,000
$2,653 34,291 $485 93 $82 - - - - - - - - - - - $2,653
34,291
kWh
$485
93
kW-months/year
$82
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
%
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$10,002
Cost:
$27,320
$6,202 100,821 $3,546 276 $254 - - - - - - - - - - - $6,202
100,821
kWh
$3,546
276
kW-months/year
$254
-
$
-
-
MMBtu
-
-
lb
-
-
$
-
-
$
-
-
%
06: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$9,039
Cost:
-
- - - - - - - - $9,039 - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$9,039
-
lb
-
-
$
-
-
$
-
-
%
07: 4.4310 TRAIN OPERATORS FOR MAXIMUM OPERATING EFFICIENCY Savings:
$13,552
Cost:
$640
- - - - - - - - - - - - $13,552 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
-
-
$
$13,552
-
$
-
-
%
08: 4.4230 MOVE PRODUCT USING MECHANICAL MEANS Savings:
$31,460
Cost:
$32,800
- - - - - - - - - - $19,860 - - - $11,600 - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
lb
$19,860
-
$
-
-
$
$11,600
-
%
TOTAL RECOMMENDED Savings:
$78,746
Cost:
$75,867
$15,985 200,176 $5,158 457 $417 - $3,135 479 $9,039 - $19,860 - $13,552 - $11,600 - $15,985
200,176
kWh
$5,158
457
kW-months/year
$417
-
$
$3,135
479
MMBtu
$9,039
-
lb
$19,860
-
$
$13,552
-
$
$11,600
-
%
TOTAL IMPLEMENTED Savings:
$51,413
Cost:
$38,147
$4,626 66,237 $1,612 181 $163 - - - - - $19,860 - $13,552 - $11,600 - $4,626
66,237
kWh
$1,612
181
kW-months/year
$163
-
$
-
-
MMBtu
-
-
lb
$19,860
-
$
$13,552
-
$
$11,600
-
%
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ lb $ $ $ $ $ %
Electricity Usage Electricity Demand Electricity Fees LPG Solid Waste (non-haz) Administrative Changes Primary Product Increase in Production Electricity Usage Electricity Demand Electricity Fees LPG Solid Waste (non-haz) Administrative Changes Primary Product Increase in Production