IAC logo
IAC Assessment: NV0160
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NV0160
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nevada
Assessment Year 2000
Principal Product Asphalt
NAICS n/a
SIC 2951 - Asphalt Paving Mixtures And Blocks
Sales $5,000,000-$10,000,000
# of Employees 3
Plant Area (Sq.Ft.) 20,000
Annual Production 250,000 Tons
Production Hrs. Annual 925
Location (State) NV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $32,203 665,885 kWh $0.05
Electricity Demand $35,445 4,641 kW-months/year $7.64
Electricity Fees $5,190 - $ -
Fuel Oil #2 $337,849 63,091 MMBtu $5.35
TOTAL ENERGY COSTS $410,687
RECOMMENDED SAVINGS* $207,296 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Electricity Fees Fuel Oil #2 Administrative Changes Primary Product Electricity Usage Electricity Demand Electricity Fees Fuel Oil #2 Administrative Changes Primary Product
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
01: 2.1114 LIMIT AND CONTROL SECONDARY COMBUSTION AIR IN FURNACE Savings:
$8,107
Cost:
$370
- - - - - - $8,107 4,090 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$8,107
4,090
MMBtu
-
-
$
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$12,666
Cost:
$240
$6,810 152,989 $5,608 734 $248 - - - - - - - $6,810
152,989
kWh
$5,608
734
kW-months/year
$248
-
$
-
-
MMBtu
-
-
$
-
-
$
03: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,918
Cost:
$8,274
$1,172 26,377 $2,669 349 $77 - - - - - - - $1,172
26,377
kWh
$2,669
349
kW-months/year
$77
-
$
-
-
MMBtu
-
-
$
-
-
$
04: 2.1321 REPLACE FOSSIL FUEL EQUIPMENT WITH ELECTRICAL EQUIPMENT Savings:
$4,907
Cost:
$2,175
- - - - - - $4,907 4,292 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$4,907
4,292
MMBtu
-
-
$
-
-
$
05: 2.2511 INSULATE BARE EQUIPMENT Savings:
$880
Cost:
$585
- - - - - - $880 164 - - - - -
-
kWh
-
-
kW-months/year
-
-
$
$880
164
MMBtu
-
-
$
-
-
$
06: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$1,742
Cost:
$125
$1,742 38,394 - - - - - - - - - - $1,742
38,394
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
07: 3.1171 CHANGE PRODUCT SPECS Savings:
$5,112
Cost:
-
- - - - - - - - $5,112 - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
$5,112
-
$
-
-
$
08: 4.1110 ADD EQUIPMENT/ OPERATORS TO REDUCE PRODUCTION BOTTLENECK Savings:
$169,964
Cost:
$15,000
$1,967 43,962 - - - - - - - - $167,997 - $1,967
43,962
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
$167,997
-
$
TOTAL RECOMMENDED Savings:
$207,296
Cost:
$26,769
$11,691 261,722 $8,277 1,083 $325 - $13,894 8,546 $5,112 - $167,997 - $11,691
261,722
kWh
$8,277
1,083
kW-months/year
$325
-
$
$13,894
8,546
MMBtu
$5,112
-
$
$167,997
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
-
-
MMBtu
-
-
$
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $ $ MMBtu $ $ $ $
Electricity Usage Electricity Demand Electricity Fees Fuel Oil #2 Administrative Changes Primary Product Electricity Usage Electricity Demand Electricity Fees Fuel Oil #2 Administrative Changes Primary Product