IAC Assessment: NV0164
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: NV0164
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center University of Nevada
Assessment Year 2000
Principal Product industrial inorganic chemicals
NAICS n/a
SIC 2819 - Industrial Inorganic Chemicals, Nec
Sales $10,000,000-$50,000,000
# of Employees 114
Plant Area (Sq.Ft.) 94,500
Annual Production 250,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) NV
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $854,367 23,323,000 kWh $0.04
Electricity Demand $137,484 36,528 kW-months/year $3.76
Electricity Fees $3,244 - $ -
Natural Gas $2,302,564 613,139 MMBtu $3.76
TOTAL ENERGY COSTS $3,302,459
RECOMMENDED SAVINGS* $349,824 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Personnel Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Personnel Changes Water Consumption
$ kWh $ kW-months/year $ MMBtu $ $ $ Tgal
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$95,346
Cost:
$200
$83,592 2,281,946 $11,754 3,126 - - - - - - $83,592
2,281,946
kWh
$11,754
3,126
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
02: 2.1113 REDUCE COMBUSTION AIR FLOW TO OPTIMUM Savings:
$75,664
Cost:
$100
- - - - $75,664 20,148 - - - - -
-
kWh
-
-
kW-months/year
$75,664
20,148
MMBtu
-
-
$
-
-
Tgal
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$21,258
Cost:
-
$18,637 403,283 $2,621 697 - - - - - - $18,637
403,283
kWh
$2,621
697
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$4,704
Cost:
$150
$4,203 114,596 $501 133 - - - - - - $4,203
114,596
kWh
$501
133
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
05: 4.426 MODIFY WORKLOAD Savings:
$8,134
Cost:
-
- - - - - - $8,134 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$8,134
-
$
-
-
Tgal
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$137,083
Cost:
$45,279
$187 2,931 - - - - $136,896 - - - $187
2,931
kWh
-
-
kW-months/year
-
-
MMBtu
$136,896
-
$
-
-
Tgal
07: 3.4151 MINIMIZE WATER USAGE Savings:
$6,651
Cost:
$432
- - - - - - - - $6,651 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$6,651
-
Tgal
08: 3.4154 ELIMINATE LEAKS IN WATER LINES AND VALVES Savings:
$984
Cost:
$100
- - - - - - - - $984 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
$984
-
Tgal
TOTAL RECOMMENDED Savings:
$349,824
Cost:
$46,261
$106,619 2,802,756 $14,876 3,956 $75,664 20,148 $145,030 - $7,635 - $106,619
2,802,756
kWh
$14,876
3,956
kW-months/year
$75,664
20,148
MMBtu
$145,030
-
$
$7,635
-
Tgal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
$
-
-
Tgal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $ $ Tgal
Electricity Usage Electricity Demand Natural Gas Personnel Changes Water Consumption Electricity Usage Electricity Demand Natural Gas Personnel Changes Water Consumption