IAC Assessment: OD0001
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OD0001
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Old Dominion Univ.
Assessment Year 1994
Principal Product Converted paper products
NAICS n/a
SIC 2679 - Converted Paper Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 115
Plant Area (Sq.Ft.) 152,000
Annual Production 0 Units
Production Hrs. Annual 2,168
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $92,163 1,052,169 kWh $0.09
Natural Gas $71,658 23,652 MMBtu $3.03
LPG $3,563 265 MMBtu $13.45
Fuel Oil #2 $8,398 2,106 MMBtu $3.99
TOTAL ENERGY COSTS $175,782
RECOMMENDED SAVINGS* $13,638 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $10,666
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$1,054
Cost:
$633
- - $1,054 348 -
-
kWh
$1,054
348
MMBtu
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$345
Cost:
$200
- - $345 114 -
-
kWh
$345
114
MMBtu
03: 2.6242 MINIMIZE OPERATION OF EQUIPMENT MAINTAINED IN STANDBY CONDITION Savings:
$2,303
Cost:
-
- - $2,303 760 -
-
kWh
$2,303
760
MMBtu
04: 2.4221 INSTALL COMPRESSOR AIR INTAKES IN COOLEST LOCATIONS Savings:
$426
Cost:
$600
$426 4,982 - - $426
4,982
kWh
-
-
MMBtu
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,155
Cost:
$800
$1,155 13,189 - - $1,155
13,189
kWh
-
-
MMBtu
06: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,686
Cost:
$2,315
$7,686 87,632 - - $7,686
87,632
kWh
-
-
MMBtu
07: 2.2113 REPAIR OR REPLACE STEAM TRAPS Savings:
$669
Cost:
$400
- - $669 200 -
-
kWh
$669
200
MMBtu
TOTAL RECOMMENDED Savings:
$13,638
Cost:
$4,948
$9,267 105,803 $4,371 1,422 $9,267
105,803
kWh
$4,371
1,422
MMBtu
TOTAL IMPLEMENTED Savings:
$10,666
Cost:
$4,548
$9,267 105,803 $1,399 462 $9,267
105,803
kWh
$1,399
462
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas