IAC Assessment: OD0021
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OD0021
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Old Dominion Univ.
Assessment Year 1995
Principal Product Armored & power cables
NAICS n/a
SIC 3357 - Nonferrous Wiredrawing & Insulating
Sales $10,000,000-$50,000,000
# of Employees 150
Plant Area (Sq.Ft.) 320,000
Annual Production 20,000,000 Pounds
Production Hrs. Annual 7,200
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $316,064 5,098,183 kWh $0.06
Natural Gas $46,152 8,646 MMBtu $5.34
TOTAL ENERGY COSTS $362,216
RECOMMENDED SAVINGS* $52,011 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $27,496
#|Description Savings
Cost
Status Electricity Usage Natural Gas Electricity Usage Natural Gas
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$24,805
Cost:
$60,851
$24,805 400,059 - - $24,805
400,059
kWh
-
-
MMBtu
02: 2.4239 ELIMINATE OR REDUCE COMPRESSED AIR USAGE Savings:
$12,122
Cost:
$14,360
$12,122 195,487 - - $12,122
195,487
kWh
-
-
MMBtu
03: 2.4322 USE OR REPLACE WITH ENERGY EFFICIENT SUBSTITUTES Savings:
$1,350
Cost:
$880
$1,350 21,688 - - $1,350
21,688
kWh
-
-
MMBtu
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,240
Cost:
$800
$1,240 19,930 - - $1,240
19,930
kWh
-
-
MMBtu
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$981
Cost:
$1,736
$981 15,826 - - $981
15,826
kWh
-
-
MMBtu
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$343
Cost:
$786
$343 5,569 - - $343
5,569
kWh
-
-
MMBtu
07: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$470
Cost:
$200
- - $470 88 -
-
kWh
$470
88
MMBtu
08: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$10,700
Cost:
$1,758
- - $10,700 2,006 -
-
kWh
$10,700
2,006
MMBtu
TOTAL RECOMMENDED Savings:
$52,011
Cost:
$81,371
$40,841 658,559 $11,170 2,094 $40,841
658,559
kWh
$11,170
2,094
MMBtu
TOTAL IMPLEMENTED Savings:
$27,496
Cost:
$63,587
$27,026 435,815 $470 88 $27,026
435,815
kWh
$470
88
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Natural Gas Electricity Usage Natural Gas