IAC logo
IAC Assessment: OD0031
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OD0031
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Old Dominion Univ.
Assessment Year 1995
Principal Product Poultry Products
NAICS n/a
SIC 2015 - Poultry Slaughtering And Processing
Sales $100,000,000-$500,000,000
# of Employees 980
Plant Area (Sq.Ft.) 330,000
Annual Production 280,000,000 Pounds
Production Hrs. Annual 4,250
Location (State) DE
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $1,553,593 27,904,162 kWh $0.06
LPG $44,322 9,395 MMBtu $4.72
Fuel Oil #2 $209,296 85,347 MMBtu $2.45
TOTAL ENERGY COSTS $1,807,211
RECOMMENDED SAVINGS* $137,863 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #2 Electricity Usage Fuel Oil #2
$ kWh $ MMBtu
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$38,274
Cost:
$45,837
$38,274 687,866 - - $38,274
687,866
kWh
-
-
MMBtu
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$5,159
Cost:
$2,803
$5,159 92,614 - - $5,159
92,614
kWh
-
-
MMBtu
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$26,349
Cost:
$66,206
$26,349 473,329 - - $26,349
473,329
kWh
-
-
MMBtu
04: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$18,336
Cost:
$48,924
$18,336 329,719 - - $18,336
329,719
kWh
-
-
MMBtu
05: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$5,440
Cost:
$1,793
$5,440 97,890 - - $5,440
97,890
kWh
-
-
MMBtu
06: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$12,618
Cost:
$26,618
- - $12,618 5,150 -
-
kWh
$12,618
5,150
MMBtu
07: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,309
Cost:
$1,000
$2,309 41,325 - - $2,309
41,325
kWh
-
-
MMBtu
08: 2.2626 AVOID FROST FORMATION ON EVAPORATORS Savings:
$29,378
Cost:
$33,000
$29,378 527,843 - - $29,378
527,843
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$137,863
Cost:
$226,181
$125,245 2,250,586 $12,618 5,150 $125,245
2,250,586
kWh
$12,618
5,150
MMBtu
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - -
-
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Fuel Oil #2 Electricity Usage Fuel Oil #2