IAC Assessment: OD0040
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OD0040
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Old Dominion Univ.
Assessment Year 1995
Principal Product Bacon
NAICS n/a
SIC 2011 - Meat Packing Plants
Sales $10,000,000-$50,000,000
# of Employees 185
Plant Area (Sq.Ft.) 38,000
Annual Production 23,695,000 Tons
Production Hrs. Annual 4,300
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $331,809 6,586,460 kWh $0.05
Fuel Oil #6 $52,949 19,413 MMBtu $2.73
TOTAL ENERGY COSTS $384,758
RECOMMENDED SAVINGS* $28,824 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $6,658
#|Description Savings
Cost
Status Electricity Usage Fuel Oil #6 Electricity Usage Fuel Oil #6
$ kWh $ MMBtu
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$7,870
Cost:
$10,484
$7,870 156,213 - - $7,870
156,213
kWh
-
-
MMBtu
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$3,135
Cost:
$8,610
$3,135 62,134 - - $3,135
62,134
kWh
-
-
MMBtu
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,814
Cost:
$3,630
$2,814 55,979 - - $2,814
55,979
kWh
-
-
MMBtu
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$13,414
Cost:
$54,257
- - $13,414 4,913 -
-
kWh
$13,414
4,913
MMBtu
05: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$882
Cost:
$780
$882 17,585 - - $882
17,585
kWh
-
-
MMBtu
06: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$709
Cost:
$800
$709 14,068 - - $709
14,068
kWh
-
-
MMBtu
TOTAL RECOMMENDED Savings:
$28,824
Cost:
$78,561
$15,410 305,979 $13,414 4,913 $15,410
305,979
kWh
$13,414
4,913
MMBtu
TOTAL IMPLEMENTED Savings:
$6,658
Cost:
$13,040
$6,658 132,181 - - $6,658
132,181
kWh
-
-
MMBtu
Savings
Cost
$ kWh $ MMBtu
Electricity Usage Fuel Oil #6 Electricity Usage Fuel Oil #6