IAC Assessment: OD0050
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Old Dominion Univ.
Assessment Year 1996
Principal Product Ceramic Fiber Components (Refractory)
NAICS n/a
SIC 3255 - Clay Refractories
Sales $5,000,000-$10,000,000
# of Employees 65
Plant Area (Sq.Ft.) 28,220
Annual Production 750,000 Pieces
Production Hrs. Annual 6,000
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $43,190 1,828,253 kWh $0.02
Electricity Demand $45,384 3,689 kW-months/year $12.30
Electricity Fees $7,379 - $ -
Natural Gas $87,066 20,922 MMBtu $4.16
TOTAL ENERGY COSTS $201,409
RECOMMENDED SAVINGS* $36,323 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $5,860
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,688
Cost:
$1,588
$1,118 23,154 $570 46 - - - - $1,118
23,154
kWh
$570
46
kW-months/year
-
-
MMBtu
-
-
lb
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,460
Cost:
$1,336
$715 30,188 $745 61 - - - - $715
30,188
kWh
$745
61
kW-months/year
-
-
MMBtu
-
-
lb
03: 2.4146 USE ADJUSTABLE FREQUENCY DRIVE OR MULTIPLE SPEED MOTORS ON EXISTING SYSTEM Savings:
$6,237
Cost:
$14,200
$6,237 264,361 - - - - - - $6,237
264,361
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$443
Cost:
$240
$217 9,086 $226 18 - - - - $217
9,086
kWh
$226
18
kW-months/year
-
-
MMBtu
-
-
lb
05: 2.3132 RECHARGE BATTERIES ON DURING OFF-PEAK DEMAND PERIODS Savings:
$765
Cost:
-
- - $765 62 - - - - -
-
kWh
$765
62
kW-months/year
-
-
MMBtu
-
-
lb
06: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$1,504
Cost:
-
- - - - $1,504 362 - - -
-
kWh
-
-
kW-months/year
$1,504
362
MMBtu
-
-
lb
07: 3.5311 RECOVER AND REUSE WASTE MATERIAL Savings:
$24,226
Cost:
$1,072
- - - - - - $24,226 48,000 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$24,226
48,000
lb
TOTAL RECOMMENDED Savings:
$36,323
Cost:
$18,436
$8,287 326,789 $2,306 187 $1,504 362 $24,226 48,000 $8,287
326,789
kWh
$2,306
187
kW-months/year
$1,504
362
MMBtu
$24,226
48,000
lb
TOTAL IMPLEMENTED Savings:
$5,860
Cost:
$3,164
$2,050 62,428 $2,306 187 $1,504 362 - - $2,050
62,428
kWh
$2,306
187
kW-months/year
$1,504
362
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)