IAC Assessment: OD0052
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OD0052
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Old Dominion Univ.
Assessment Year 1996
Principal Product Bleach
NAICS n/a
SIC 2819 - Industrial Inorganic Chemicals, Nec
Sales $10,000,000-$50,000,000
# of Employees 72
Plant Area (Sq.Ft.) 60,000
Annual Production 5,000 Thousand Gallons
Production Hrs. Annual 2,340
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $45,307 790,445 kWh $0.06
Electricity Demand $15,794 3,416 kW-months/year $4.62
Electricity Fees $12,804 - $ -
Natural Gas $541 60 MMBtu $9.02
LPG $1,860 200 MMBtu $9.30
TOTAL ENERGY COSTS $96,813
RECOMMENDED SAVINGS* $9,746 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $8,052
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)
$ kWh $ kW-months/year $ lb
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$8,052
Cost:
$1,600
$5,696 99,355 $2,356 510 - - $5,696
99,355
kWh
$2,356
510
kW-months/year
-
-
lb
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$507
Cost:
$1,624
$392 4,982 $115 25 - - $392
4,982
kWh
$115
25
kW-months/year
-
-
lb
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$978
Cost:
$1,041
$692 12,016 $286 62 - - $692
12,016
kWh
$286
62
kW-months/year
-
-
lb
04: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$209
Cost:
-
- - - - $209 7,000 -
-
kWh
-
-
kW-months/year
$209
7,000
lb
TOTAL RECOMMENDED Savings:
$9,746
Cost:
$4,265
$6,780 116,353 $2,757 597 $209 7,000 $6,780
116,353
kWh
$2,757
597
kW-months/year
$209
7,000
lb
TOTAL IMPLEMENTED Savings:
$8,052
Cost:
$1,600
$5,696 99,355 $2,356 510 - - $5,696
99,355
kWh
$2,356
510
kW-months/year
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ lb
Electricity Usage Electricity Demand Solid Waste (non-haz) Electricity Usage Electricity Demand Solid Waste (non-haz)