IAC Assessment: OD0055
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OD0055
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Old Dominion Univ.
Assessment Year 1996
Principal Product Insulation
NAICS n/a
SIC 3296 - Mineral Wool
Sales $10,000,000-$50,000,000
# of Employees 45
Plant Area (Sq.Ft.) 100,000
Annual Production 150 Thousand Feet
Production Hrs. Annual 2,080
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $22,013 398,300 kWh $0.06
Electricity Demand $8,112 1,374 kW-months/year $5.90
Electricity Fees $2,644 - $ -
Fuel Oil #2 $20,076 5,022 MMBtu $4.00
TOTAL ENERGY COSTS $53,987
RECOMMENDED SAVINGS* $4,803 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $690
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #2 Water Disposal Solid Waste (non-haz) Electricity Usage Electricity Demand Fuel Oil #2 Water Disposal Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$377
Cost:
$947
$307 5,569 $70 12 - - - - - - $307
5,569
kWh
$70
12
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
02: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$521
Cost:
$486
$380 6,741 $141 24 - - - - - - $380
6,741
kWh
$141
24
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$313
Cost:
$200
$313 5,569 - - - - - - - - $313
5,569
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
04: 2.5121 REDESIGN FLOW TO MINIMIZE MASS TRANSFER LENGTH Savings:
$957
Cost:
$103
$793 14,361 $164 28 - - - - - - $793
14,361
kWh
$164
28
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$1,109
Cost:
$1,536
$724 13,189 $385 65 - - - - - - $724
13,189
kWh
$385
65
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$980
Cost:
$500
- - - - $980 245 - - - - -
-
kWh
-
-
kW-months/year
$980
245
MMBtu
-
-
Tgal
-
-
lb
07: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$388
Cost:
$240
- - - - - - $388 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$388
-
Tgal
-
-
lb
08: 3.5248 SEPARATE AND RECYCLE SCRAP METAL TO FOUNDRY OR FOR SALE Savings:
$158
Cost:
-
- - - - - - - - $158 12,600 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
Tgal
$158
12,600
lb
TOTAL RECOMMENDED Savings:
$4,803
Cost:
$4,012
$2,517 45,429 $760 129 $980 245 $388 - $158 12,600 $2,517
45,429
kWh
$760
129
kW-months/year
$980
245
MMBtu
$388
-
Tgal
$158
12,600
lb
TOTAL IMPLEMENTED Savings:
$690
Cost:
$1,147
$620 11,138 $70 12 - - - - - - $620
11,138
kWh
$70
12
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb
Electricity Usage Electricity Demand Fuel Oil #2 Water Disposal Solid Waste (non-haz) Electricity Usage Electricity Demand Fuel Oil #2 Water Disposal Solid Waste (non-haz)