IAC logo
IAC Assessment: OD0058
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OD0058
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Old Dominion Univ.
Assessment Year 1996
Principal Product Calcium aluminate cements
NAICS n/a
SIC 3297 - Nonclay Refractories
Sales $10,000,000-$50,000,000
# of Employees 99
Plant Area (Sq.Ft.) 200,000
Annual Production 100,000 Tons
Production Hrs. Annual 8,232
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $231,232 13,266,120 kWh $0.02
Electricity Demand $302,416 54,695 kW-months/year $5.53
Electricity Fees $24,094 - $ -
Natural Gas $194,225 76,730 MMBtu $2.53
TOTAL ENERGY COSTS $754,190
RECOMMENDED SAVINGS* $32,346 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $9,339
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz)
$ kWh $ kW-months/year $ MMBtu $ gal
01: 2.2511 INSULATE BARE EQUIPMENT Savings:
$21,127
Cost:
$16,700
- - - - $21,127 8,730 - - -
-
kWh
-
-
kW-months/year
$21,127
8,730
MMBtu
-
-
gal
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$2,002
Cost:
$5,256
$1,266 72,685 $736 133 - - - - $1,266
72,685
kWh
$736
133
kW-months/year
-
-
MMBtu
-
-
gal
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$885
Cost:
$2,412
$476 27,257 $409 74 - - - - $476
27,257
kWh
$409
74
kW-months/year
-
-
MMBtu
-
-
gal
04: 2.7134 USE PHOTOCELL CONTROLS Savings:
$581
Cost:
$388
$548 35,463 $33 6 - - - - $548
35,463
kWh
$33
6
kW-months/year
-
-
MMBtu
-
-
gal
05: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$6,452
Cost:
$1,200
$6,452 372,216 - - - - - - $6,452
372,216
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
06: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$1,299
Cost:
$3,360
- - - - $859 124 $440 880 -
-
kWh
-
-
kW-months/year
$859
124
MMBtu
$440
880
gal
TOTAL RECOMMENDED Savings:
$32,346
Cost:
$29,316
$8,742 507,621 $1,178 213 $21,986 8,854 $440 880 $8,742
507,621
kWh
$1,178
213
kW-months/year
$21,986
8,854
MMBtu
$440
880
gal
TOTAL IMPLEMENTED Savings:
$9,339
Cost:
$8,868
$8,194 472,158 $1,145 207 - - - - $8,194
472,158
kWh
$1,145
207
kW-months/year
-
-
MMBtu
-
-
gal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz)