IAC logo
IAC Assessment: OD0059
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OD0059
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Old Dominion Univ.
Assessment Year 1996
Principal Product Upholstery and curtain fabrics
NAICS n/a
SIC 2221 - Broadwoven Fabric Mills, Manmade
Sales $10,000,000-$50,000,000
# of Employees 118
Plant Area (Sq.Ft.) 135,000
Annual Production 45,000,000 Thousand Feet
Production Hrs. Annual 5,760
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $131,042 6,418,230 kWh $0.02
Electricity Demand $166,972 12,510 kW-months/year $13.35
Electricity Fees $28,780 - $ -
LPG $8,661 739 MMBtu $11.72
Fuel Oil #6 $49,296 10,019 MMBtu $4.92
TOTAL ENERGY COSTS $384,801
RECOMMENDED SAVINGS* $27,143 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Fuel Oil #6 Other Liquid (non-haz) Electricity Usage Electricity Demand LPG Fuel Oil #6 Other Liquid (non-haz)
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ gal
01: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,899
Cost:
$1,600
$1,899 93,200 - - - - - - - - $1,899
93,200
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
gal
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$949
Cost:
$2,562
$402 19,637 $547 41 - - - - - - $402
19,637
kWh
$547
41
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
gal
03: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$1,319
Cost:
$1,285
$558 27,257 $761 57 - - - - - - $558
27,257
kWh
$761
57
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
gal
04: 2.7135 INSTALL OCCUPANCY SENSORS Savings:
$297
Cost:
$200
$297 14,654 - - - - - - - - $297
14,654
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
gal
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$13,841
Cost:
$13,842
$5,441 266,706 $8,400 629 - - - - - - $5,441
266,706
kWh
$8,400
629
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
gal
06: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$3,287
Cost:
$1,495
- - - - - - $3,287 668 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$3,287
668
MMBtu
-
-
gal
07: 2.7132 INSTALL TIMERS ON LIGHT SWITCHES IN LITTLE USED AREAS Savings:
$1,434
Cost:
$423
$1,434 34,584 - - - - - - - - $1,434
34,584
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
gal
08: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$4,117
Cost:
$4,335
- - - - $4,067 739 - - $50 385 -
-
kWh
-
-
kW-months/year
$4,067
739
MMBtu
-
-
MMBtu
$50
385
gal
TOTAL RECOMMENDED Savings:
$27,143
Cost:
$25,742
$10,031 456,038 $9,708 727 $4,067 739 $3,287 668 $50 385 $10,031
456,038
kWh
$9,708
727
kW-months/year
$4,067
739
MMBtu
$3,287
668
MMBtu
$50
385
gal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
gal
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ gal
Electricity Usage Electricity Demand LPG Fuel Oil #6 Other Liquid (non-haz) Electricity Usage Electricity Demand LPG Fuel Oil #6 Other Liquid (non-haz)