IAC logo
IAC Assessment: OD0068
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OD0068
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Old Dominion Univ.
Assessment Year 1996
Principal Product Textile Processing
NAICS n/a
SIC 2463 -
Sales $10,000,000-$50,000,000
# of Employees 185
Plant Area (Sq.Ft.) 102,000
Annual Production 90,000 Thousand Feet
Production Hrs. Annual 7,200
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $116,871 6,091,442 kWh $0.02
Electricity Demand $162,105 13,764 kW-months/year $11.78
Electricity Fees $31,855 - $ -
Natural Gas $292,146 89,580 MMBtu $3.26
TOTAL ENERGY COSTS $675,776
RECOMMENDED SAVINGS* $22,141 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ lb
01: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$6,883
Cost:
$12,945
$3,403 177,315 $3,480 295 - - - - $3,403
177,315
kWh
$3,480
295
kW-months/year
-
-
MMBtu
-
-
lb
02: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,972
Cost:
$6,824
$1,616 84,701 $2,356 200 - - - - $1,616
84,701
kWh
$2,356
200
kW-months/year
-
-
MMBtu
-
-
lb
03: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$2,832
Cost:
$600
$2,832 147,421 - - - - - - $2,832
147,421
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
04: 2.2211 USE OPTIMUM TEMPERATURE Savings:
$6,054
Cost:
-
- - - - $6,054 1,857 - - -
-
kWh
-
-
kW-months/year
$6,054
1,857
MMBtu
-
-
lb
05: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$2,400
Cost:
-
- - - - - - $2,400 240,000 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,400
240,000
lb
TOTAL RECOMMENDED Savings:
$22,141
Cost:
$20,369
$7,851 409,437 $5,836 495 $6,054 1,857 $2,400 240,000 $7,851
409,437
kWh
$5,836
495
kW-months/year
$6,054
1,857
MMBtu
$2,400
240,000
lb
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz)