IAC logo
IAC Assessment: OD0075
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OD0075
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Old Dominion Univ.
Assessment Year 1996
Principal Product Yarn and fabric
NAICS n/a
SIC 2211 - Broadwoven Fabric Mills, Cotton
Sales $50,000,000-$100,000,000
# of Employees 432
Plant Area (Sq.Ft.) 371,309
Annual Production 70,750,000 Pounds
Production Hrs. Annual 8,400
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $712,534 43,926,144 kWh $0.02
Electricity Demand $950,401 141,208 kW-months/year $6.73
Electricity Fees $189,215 - $ -
Fuel Oil #6 $1,861,104 504,756 MMBtu $3.69
TOTAL ENERGY COSTS $3,713,254
RECOMMENDED SAVINGS* $104,954 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $56,858
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #6 By-product Production Electricity Usage Electricity Demand Fuel Oil #6 By-product Production
$ kWh $ kW-months/year $ MMBtu $ $
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$21,911
Cost:
$1,400
- - - - $21,911 5,938 - - -
-
kWh
-
-
kW-months/year
$21,911
5,938
MMBtu
-
-
$
02: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$13,096
Cost:
$5,800
- - - - $13,096 3,549 - - -
-
kWh
-
-
kW-months/year
$13,096
3,549
MMBtu
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$22,546
Cost:
$51,404
$14,369 886,870 $8,177 1,215 - - - - $14,369
886,870
kWh
$8,177
1,215
kW-months/year
-
-
MMBtu
-
-
$
04: 2.2612 USE COOLING TOWER WATER INSTEAD OF REFRIGERATION Savings:
$4,186
Cost:
$5,691
$2,833 144,783 $1,353 201 - - - - $2,833
144,783
kWh
$1,353
201
kW-months/year
-
-
MMBtu
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$5,775
Cost:
$19,955
$3,588 221,571 $2,187 325 - - - - $3,588
221,571
kWh
$2,187
325
kW-months/year
-
-
MMBtu
-
-
$
06: 2.4111 UTILIZE ENERGY-EFFICIENT BELTS AND OTHER IMPROVED MECHANISMS Savings:
$2,440
Cost:
$3,111
$1,531 94,666 $909 135 - - - - $1,531
94,666
kWh
$909
135
kW-months/year
-
-
MMBtu
-
-
$
07: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$35,000
Cost:
-
- - - - - - $35,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$35,000
-
$
TOTAL RECOMMENDED Savings:
$104,954
Cost:
$87,361
$22,321 1,347,890 $12,626 1,876 $35,007 9,487 $35,000 - $22,321
1,347,890
kWh
$12,626
1,876
kW-months/year
$35,007
9,487
MMBtu
$35,000
-
$
TOTAL IMPLEMENTED Savings:
$56,858
Cost:
$81,561
$22,321 1,347,890 $12,626 1,876 $21,911 5,938 - - $22,321
1,347,890
kWh
$12,626
1,876
kW-months/year
$21,911
5,938
MMBtu
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ $
Electricity Usage Electricity Demand Fuel Oil #6 By-product Production Electricity Usage Electricity Demand Fuel Oil #6 By-product Production