IAC logo
IAC Assessment: OD0076
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OD0076
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Old Dominion Univ.
Assessment Year 1997
Principal Product Electroplated and Annealed Parts
NAICS n/a
SIC 3471 - Plating And Polishing
Sales $10,000,000-$50,000,000
# of Employees 108
Plant Area (Sq.Ft.) 90,000
Annual Production 50,000,000 Pieces
Production Hrs. Annual 7,488
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $54,969 3,335,287 kWh $0.02
Electricity Demand $110,361 15,609 kW-months/year $7.07
Electricity Fees $19,364 - $ -
Natural Gas $91,121 19,969 MMBtu $4.56
TOTAL ENERGY COSTS $309,189
RECOMMENDED SAVINGS* $16,372 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $2,171
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Primary Product
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $
01: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$4,337
Cost:
$1,495
- - - - $4,337 951 - - - - - - -
-
kWh
-
-
kW-months/year
$4,337
951
MMBtu
-
-
gal
-
-
lb
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,063
Cost:
$2,738
$667 40,445 $396 56 - - - - - - - - $667
40,445
kWh
$396
56
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
03: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$723
Cost:
$882
$448 27,257 $275 39 - - - - - - - - $448
27,257
kWh
$275
39
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
04: 2.7261 INSTALL TIMERS AND/OR THERMOSTATS Savings:
$385
Cost:
$210
$385 23,447 - - - - - - - - - - $385
23,447
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
05: 3.6193 INSTALL EQUIPMENT (eg COMPACTOR) TO REDUCE DISPOSAL COSTS Savings:
$996
Cost:
$1,452
- - - - - - - - $996 2,080 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
$996
2,080
lb
-
-
$
06: 3.3131 USE EVAPORATION TO CONCENTRATE MATERIAL Savings:
$2,088
Cost:
$625
- - - - - - $2,088 1,440 - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$2,088
1,440
gal
-
-
lb
-
-
$
07: 4.123 REDUCE DEFECTS BY REDUCING PRODUCT TIPPING Savings:
$6,780
Cost:
$1,911
- - - - - - - - - - $6,780 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
$6,780
-
$
TOTAL RECOMMENDED Savings:
$16,372
Cost:
$9,313
$1,500 91,149 $671 95 $4,337 951 $2,088 1,440 $996 2,080 $6,780 - $1,500
91,149
kWh
$671
95
kW-months/year
$4,337
951
MMBtu
$2,088
1,440
gal
$996
2,080
lb
$6,780
-
$
TOTAL IMPLEMENTED Savings:
$2,171
Cost:
$3,830
$1,500 91,149 $671 95 - - - - - - - - $1,500
91,149
kWh
$671
95
kW-months/year
-
-
MMBtu
-
-
gal
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ gal $ lb $ $
Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Natural Gas Other Liquid (non-haz) Solid Waste (non-haz) Primary Product