IAC logo
IAC Assessment: OD0078
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OD0078
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Old Dominion Univ.
Assessment Year 1997
Principal Product Aquatic Sports Equipment
NAICS n/a
SIC 3949 - Sporting And Athletic Goods, Nec
Sales $10,000,000-$50,000,000
# of Employees 50
Plant Area (Sq.Ft.) 160,000
Annual Production 1,100,000 Pieces
Production Hrs. Annual 6,000
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $54,564 1,047,480 kWh $0.05
Electricity Demand $22,053 3,764 kW-months/year $5.86
Electricity Fees $4,935 - $ -
Natural Gas $63,115 15,097 MMBtu $4.18
TOTAL ENERGY COSTS $198,709
RECOMMENDED SAVINGS* $196,162 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $189,580
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Primary Product
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$3,363
Cost:
$1,118
$3,301 63,306 $62 11 - - - - - - $3,301
63,306
kWh
$62
11
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$4,909
Cost:
$800
$4,909 91,442 - - - - - - - - $4,909
91,442
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.6218 TURN OFF EQUIPMENT WHEN NOT IN USE Savings:
$205
Cost:
$360
$205 3,810 - - - - - - - - $205
3,810
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$297
Cost:
$453
$242 4,689 $55 9 - - - - - - $242
4,689
kWh
$55
9
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
05: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$4,337
Cost:
$1,495
- - - - $4,337 951 - - - - -
-
kWh
-
-
kW-months/year
$4,337
951
MMBtu
-
-
lb
-
-
$
06: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$2,717
Cost:
$3,000
- - - - $2,717 681 - - - - -
-
kWh
-
-
kW-months/year
$2,717
681
MMBtu
-
-
lb
-
-
$
07: 3.6192 USE A LESS EXPENSIVE METHOD OF WASTE REMOVAL Savings:
$12,812
Cost:
-
- - - - - - $12,812 1,570,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$12,812
1,570,000
lb
-
-
$
08: 4.1220 DEVELOP STANDARD PROCEDURES TO IMPROVE INTERNAL YIELDS Savings:
$167,522
Cost:
-
- - - - - - $1,294 18,750 $166,228 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$1,294
18,750
lb
$166,228
-
$
TOTAL RECOMMENDED Savings:
$196,162
Cost:
$7,226
$8,657 163,247 $117 20 $7,054 1,632 $14,106 1,588,750 $166,228 - $8,657
163,247
kWh
$117
20
kW-months/year
$7,054
1,632
MMBtu
$14,106
1,588,750
lb
$166,228
-
$
TOTAL IMPLEMENTED Savings:
$189,580
Cost:
$2,295
$4,909 91,442 - - $4,337 951 $14,106 1,588,750 $166,228 - $4,909
91,442
kWh
-
-
kW-months/year
$4,337
951
MMBtu
$14,106
1,588,750
lb
$166,228
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Primary Product Electricity Usage Electricity Demand Natural Gas Solid Waste (non-haz) Primary Product