IAC logo
IAC Assessment: OD0083
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OD0083
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Old Dominion Univ.
Assessment Year 1997
Principal Product Plastic Cups
NAICS n/a
SIC 3089 - Plastics Products, Nec
Sales $10,000,000-$50,000,000
# of Employees 57
Plant Area (Sq.Ft.) 77,000
Annual Production 17,000,000 Pieces
Production Hrs. Annual 8,736
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $231,093 13,048,652 kWh $0.02
Electricity Demand $296,533 24,758 kW-months/year $11.98
Electricity Fees $58,371 - $ -
LPG $14,718 1,145 MMBtu $12.85
TOTAL ENERGY COSTS $600,715
RECOMMENDED SAVINGS* $517,462 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Primary Product Electricity Usage Electricity Demand Primary Product
$ kWh $ kW-months/year $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,624
Cost:
$1,487
$1,360 76,788 $1,264 106 - - $1,360
76,788
kWh
$1,264
106
kW-months/year
-
-
$
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,747
Cost:
$5,202
$898 50,703 $849 71 - - $898
50,703
kWh
$849
71
kW-months/year
-
-
$
03: 2.7447 INSTALL VINYL STRIP / HIGH SPEED / AIR CURTAIN DOORS Savings:
$1,031
Cost:
$2,091
$1,031 58,324 - - - - $1,031
58,324
kWh
-
-
kW-months/year
-
-
$
04: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$12,028
Cost:
$5,691
$5,846 330,305 $6,182 516 - - $5,846
330,305
kWh
$6,182
516
kW-months/year
-
-
$
05: 4.611 BEGIN A PRACTICE OF PREDICTIVE / PREVENTATIVE MAINTENANCE Savings:
$500,032
Cost:
$30,482
- - - - $500,032 - -
-
kWh
-
-
kW-months/year
$500,032
-
$
TOTAL RECOMMENDED Savings:
$517,462
Cost:
$44,953
$9,135 516,120 $8,295 693 $500,032 - $9,135
516,120
kWh
$8,295
693
kW-months/year
$500,032
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ $
Electricity Usage Electricity Demand Primary Product Electricity Usage Electricity Demand Primary Product