IAC Assessment: OD0085
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OD0085
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Old Dominion Univ.
Assessment Year 1997
Principal Product fabrics
NAICS n/a
SIC 2211 - Broadwoven Fabric Mills, Cotton
Sales $10,000,000-$50,000,000
# of Employees 127
Plant Area (Sq.Ft.) 84,000
Annual Production 5,400,000 Thousand Feet
Production Hrs. Annual 6,000
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $34,609 1,582,063 kWh $0.02
Electricity Demand $43,411 3,653 kW-months/year $11.88
Electricity Fees $7,887 - $ -
LPG $8,206 1,044 MMBtu $7.86
Fuel Oil #4 $14,418 3,655 MMBtu $3.94
TOTAL ENERGY COSTS $116,279
RECOMMENDED SAVINGS* $120,672 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Fuel Oil #4 Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Fuel Oil #4 Solid Waste (non-haz) Administrative Changes
$ kWh $ kW-months/year $ MMBtu $ lb $ $
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$2,532
Cost:
$3,048
$1,213 55,393 $1,319 111 - - - - - - $1,213
55,393
kWh
$1,319
111
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
02: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,568
Cost:
$589
$1,568 71,512 - - - - - - - - $1,568
71,512
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
03: 2.2437 RECOVER WASTE HEAT FROM EQUIPMENT Savings:
$1,915
Cost:
$1,750
- - - - $1,915 486 - - - - -
-
kWh
-
-
kW-months/year
$1,915
486
MMBtu
-
-
lb
-
-
$
04: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$1,962
Cost:
$1,495
- - - - $1,962 498 - - - - -
-
kWh
-
-
kW-months/year
$1,962
498
MMBtu
-
-
lb
-
-
$
05: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$1,327
Cost:
$2,285
$638 29,015 $689 58 - - - - - - $638
29,015
kWh
$689
58
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
06: 3.5315 LEASE / PURCHASE BALER; SELL CARDBOARD TO RECYCLER Savings:
$6,000
Cost:
-
- - - - - - $6,000 600,000 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$6,000
600,000
lb
-
-
$
07: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$5,368
Cost:
-
- - - - - - $5,368 75,600 - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$5,368
75,600
lb
-
-
$
08: 4.511 EXPAND OPERATIONS INTO UNUSED SPACE Savings:
$100,000
Cost:
$51,000
- - - - - - - - $100,000 - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
$100,000
-
$
TOTAL RECOMMENDED Savings:
$120,672
Cost:
$60,167
$3,419 155,920 $2,008 169 $3,877 984 $11,368 675,600 $100,000 - $3,419
155,920
kWh
$2,008
169
kW-months/year
$3,877
984
MMBtu
$11,368
675,600
lb
$100,000
-
$
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - - - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
lb
-
-
$
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ lb $ $
Electricity Usage Electricity Demand Fuel Oil #4 Solid Waste (non-haz) Administrative Changes Electricity Usage Electricity Demand Fuel Oil #4 Solid Waste (non-haz) Administrative Changes