IAC Assessment: OD0087
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OD0087
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Old Dominion Univ.
Assessment Year 1997
Principal Product Timber Harvesting Equipment
NAICS n/a
SIC 3531 - Construction Machinery
Sales $50,000,000-$100,000,000
# of Employees 200
Plant Area (Sq.Ft.) 161,500
Annual Production 480 Units
Production Hrs. Annual 2,717
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $60,295 2,405,041 kWh $0.03
Electricity Demand $90,444 7,403 kW-months/year $12.22
Electricity Fees $15,617 - $ -
LPG $88,973 12,056 MMBtu $7.38
TOTAL ENERGY COSTS $265,929
RECOMMENDED SAVINGS* $14,558 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* -
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Other Liquid (non-haz) Electricity Usage Electricity Demand Other Liquid (non-haz)
$ kWh $ kW-months/year $ gal
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$542
Cost:
$1,018
$261 10,551 $281 23 - - $261
10,551
kWh
$281
23
kW-months/year
-
-
gal
02: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$682
Cost:
$161
$328 13,189 $354 29 - - $328
13,189
kWh
$354
29
kW-months/year
-
-
gal
03: 2.4224 UPGRADE CONTROLS ON COMPRESSORS Savings:
$783
Cost:
$560
$783 31,067 - - - - $783
31,067
kWh
-
-
kW-months/year
-
-
gal
04: 2.4236 ELIMINATE LEAKS IN INERT GAS AND COMPRESSED AIR LINES/ VALVES Savings:
$1,205
Cost:
$1,189
$1,205 48,066 - - - - $1,205
48,066
kWh
-
-
kW-months/year
-
-
gal
05: 3.6124 BURN WASTE OIL FOR HEAT Savings:
$1,885
Cost:
$3,091
- - - - $1,885 2,670 -
-
kWh
-
-
kW-months/year
$1,885
2,670
gal
06: 3.3128 UTILIZE OTHER METHODS TO REMOVE CONTAMINANTS Savings:
$9,461
Cost:
$12,800
- - - - $9,461 11,847 -
-
kWh
-
-
kW-months/year
$9,461
11,847
gal
TOTAL RECOMMENDED Savings:
$14,558
Cost:
$18,819
$2,577 102,873 $635 52 $11,346 14,517 $2,577
102,873
kWh
$635
52
kW-months/year
$11,346
14,517
gal
TOTAL IMPLEMENTED Savings:
-
Cost:
-
- - - - - - -
-
kWh
-
-
kW-months/year
-
-
gal
Savings
Cost
$ kWh $ kW-months/year $ gal
Electricity Usage Electricity Demand Other Liquid (non-haz) Electricity Usage Electricity Demand Other Liquid (non-haz)