IAC Assessment: OD0090
Sponsored by:
DOE MESC
IAC logo
IAC Assessment: OD0090
Implementation Grant Funding Opportunity Open
IMPORTANT: The grant program operates on a rolling basis and applications may be submitted at any time, with quarterly reviews.
Learn More
Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Old Dominion Univ.
Assessment Year 1997
Principal Product Wooden Doors
NAICS n/a
SIC 3442 - Metal Doors, Sash, And Trim
Sales $500,000-$1,000,000
# of Employees 21
Plant Area (Sq.Ft.) 8,000
Annual Production 18,000 Pieces
Production Hrs. Annual 2,600
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $6,429 140,387 kWh $0.05
Electricity Demand $5,052 557 kW-months/year $9.07
Electricity Fees $1,167 - $ -
LPG $1,326 119 MMBtu $11.14
Fuel Oil #4 $2,683 362 MMBtu $7.41
TOTAL ENERGY COSTS $18,037
RECOMMENDED SAVINGS* $2,822 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $877
#|Description Savings
Cost
Status Electricity Usage Electricity Demand LPG Fuel Oil #2 Solid Waste (non-haz) Electricity Usage Electricity Demand LPG Fuel Oil #2 Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ lb
01: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$863
Cost:
$1,657
$451 55,393 $412 111 - - - - - - $451
55,393
kWh
$412
111
kW-months/year
-
-
MMBtu
-
-
MMBtu
-
-
lb
02: 2.1331 BURN A LESS EXPENSIVE GRADE OF FUEL Savings:
$877
Cost:
$688
- - - - $2,666 240 $(-1,789) (-241) - - -
-
kWh
-
-
kW-months/year
$2,666
240
MMBtu
$(-1,789)
(-241)
MMBtu
-
-
lb
03: 3.5313 INCREASE AMOUNT OF WASTE RECOVERED FOR RESALE Savings:
$1,082
Cost:
-
- - - - - - - - $1,082 8,112 -
-
kWh
-
-
kW-months/year
-
-
MMBtu
-
-
MMBtu
$1,082
8,112
lb
TOTAL RECOMMENDED Savings:
$2,822
Cost:
$2,345
$451 55,393 $412 111 $2,666 240 $(-1,789) (-241) $1,082 8,112 $451
55,393
kWh
$412
111
kW-months/year
$2,666
240
MMBtu
$(-1,789)
(-241)
MMBtu
$1,082
8,112
lb
TOTAL IMPLEMENTED Savings:
$877
Cost:
$688
- - - - $2,666 240 $(-1,789) (-241) - - -
-
kWh
-
-
kW-months/year
$2,666
240
MMBtu
$(-1,789)
(-241)
MMBtu
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ MMBtu $ lb
Electricity Usage Electricity Demand LPG Fuel Oil #2 Solid Waste (non-haz) Electricity Usage Electricity Demand LPG Fuel Oil #2 Solid Waste (non-haz)