Implementation Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received IAC or Combined Heat and Power Technical Assistance Partnership assessments between 2018 and 2024, can now apply for grants for implementation of assessment recommendations up 50% of qualifying* project costs with a maximum of $300,000 per manufacturer.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
IAC Center Old Dominion Univ.
Assessment Year 1997
Principal Product Synthetic Fiber
NAICS n/a
SIC 2221 - Broadwoven Fabric Mills, Manmade
Sales $5,000,000-$10,000,000
# of Employees 150
Plant Area (Sq.Ft.) 260,074
Annual Production 11,000,000 Pounds
Production Hrs. Annual 8,760
Location (State) VA
Source Yearly Cost Usage Unit Unit Cost
Electricity Usage $400,694 24,991,208 kWh $0.02
Electricity Demand $541,850 39,735 kW-months/year $13.64
Electricity Fees $14,869 - $ -
Natural Gas $160,363 45,835 MMBtu $3.50
Fuel Oil #2 $121,593 28,870 MMBtu $4.21
TOTAL ENERGY COSTS $1,261,682
RECOMMENDED SAVINGS* $125,793 *Non-energy impacts
included in savings.
See recommendations below
IMPLEMENTED SAVINGS* $81,151
#|Description Savings
Cost
Status Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz)
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb
01: 2.2622 REPLACE EXISTING CHILLER WITH HIGH EFFICIENCY MODEL Savings:
$32,105
Cost:
$53,256
$14,755 922,333 $17,350 1,272 - - - - - - $14,755
922,333
kWh
$17,350
1,272
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
02: 2.1233 ANALYZE FLUE GAS FOR PROPER AIR/FUEL RATIO Savings:
$19,107
Cost:
$1,495
- - - - $19,107 4,905 - - - - -
-
kWh
-
-
kW-months/year
$19,107
4,905
MMBtu
-
-
Tgal
-
-
lb
03: 2.2414 USE WASTE HEAT FROM HOT FLUE GASES TO PREHEAT Savings:
$9,578
Cost:
$6,300
- - - - $9,578 2,481 - - - - -
-
kWh
-
-
kW-months/year
$9,578
2,481
MMBtu
-
-
Tgal
-
-
lb
04: 2.4133 USE MOST EFFICIENT TYPE OF ELECTRIC MOTORS Savings:
$562
Cost:
$2,705
$365 22,860 $197 14 - - - - - - $365
22,860
kWh
$197
14
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
05: 2.7142 UTILIZE HIGHER EFFICIENCY LAMPS AND/OR BALLASTS Savings:
$9,299
Cost:
$9,865
$4,262 266,413 $5,037 369 - - - - - - $4,262
266,413
kWh
$5,037
369
kW-months/year
-
-
MMBtu
-
-
Tgal
-
-
lb
06: 3.4116 METER RECYCLED WATER (TO REDUCE SEWER CHARGES) Savings:
$10,500
Cost:
$4,095
- - - - - - $10,500 - - - -
-
kWh
-
-
kW-months/year
-
-
MMBtu
$10,500
-
Tgal
-
-
lb
07: 3.6122 INSTALL SOLID WASTE INCINERATOR FOR HEAT Savings:
$44,642
Cost:
$16,696
- - - - $38,342 9,946 - - $6,300 109,500 -
-
kWh
-
-
kW-months/year
$38,342
9,946
MMBtu
-
-
Tgal
$6,300
109,500
lb
TOTAL RECOMMENDED Savings:
$125,793
Cost:
$94,412
$19,382 1,211,606 $22,584 1,655 $67,027 17,332 $10,500 - $6,300 109,500 $19,382
1,211,606
kWh
$22,584
1,655
kW-months/year
$67,027
17,332
MMBtu
$10,500
-
Tgal
$6,300
109,500
lb
TOTAL IMPLEMENTED Savings:
$81,151
Cost:
$77,716
$19,382 1,211,606 $22,584 1,655 $28,685 7,386 $10,500 - - - $19,382
1,211,606
kWh
$22,584
1,655
kW-months/year
$28,685
7,386
MMBtu
$10,500
-
Tgal
-
-
lb
Savings
Cost
$ kWh $ kW-months/year $ MMBtu $ Tgal $ lb
Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz) Electricity Usage Electricity Demand Natural Gas Water Disposal Solid Waste (non-haz)